flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Product Solutions June 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.


By By Raissa Rocha, Associate Editor | May 31, 2012
This article first appeared in the June 2012 issue of BD+C.

LOW-EMISSION PRODUCTS HELP MEET HIGH-PERFORMANCE STANDARDS

A new line of Dow Epoxy products feature high-performance D.E.H. curing agents. The portfolio includes epoxy components,specialty resins, curing agents, resin blends, and formulated hardener solutions. Specialty offerings in the expanded epoxy portfolio include low-emission and waterborne curing agents. The next-generation D.E.H. 800 waterborne series curing agents are particularly useful in flooring and indoor locations where organic solvents need to be avoided. Benefits include low odor, rapid drying and curing for faster application, and curing ability at low temperatures to allow application in a variety of seasons.

Dow Epoxy

Circle No. 806 on Reader Service Card

NEW COMMERCIAL FAUCETS PROVIDE MODERN STYLE, WATER SAVINGS

Designed for the commercial plumbing industry, the new 3500 Series of water metering faucets provides a modern look for offices, retail stores, restaurants, and hospitality settings. The self-closing MVP metering cartridge provides precise water flow and shuts off automatically, conserving water. The series’ solid ECAST brass, chrome-plated body meets local requirements for the reduction of lead in plumbing fixtures. Pre-installed stainless steel hoses connect to standard water supplies. Internal temperature control is accessible above the deck for easy adjustment.

Chicago Faucets

Circle No. 807 on Reader Service Card

WALL-CLADDING SYSTEMS GIVE EDGE TO INTERIOR SPACES

Edge interior cladding systems come in four configurations and can also be customized to fit a wide range of spaces. Made with 3form Studio’s Varia Ecoresin material and available in thousands of C3 color interlayers, Edge systems allow Building Teams to refine hues, intensify colors, and alter light transmission to any desired effect, creating a contoured, motion-filled look to interior spaces. Edge systems are premade wall-cladding solutions for 3form’s collection of Ready to Go packages.

3form Studio

Circle No. 808 on Reader Service Card

Related Stories

| Dec 29, 2011

OSHA enforcing new fall hazard standards

OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.

| Dec 29, 2011

Decision not to fireproof the new World Trade Center Transportation Hub criticized

Some criticized the decision, reasoning that the structure could be a terrorist target.

| Dec 29, 2011

Seismic safety in question at thousands of California public schools

California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.

| Dec 29, 2011

GreenWizard offers cloud-based LEED credit management, assessment

The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.

| Dec 27, 2011

Clayco awarded expansion of Washington University Data Center in St. Louis

Once completed, the new building addition will double the size of the data center which houses sophisticated computer networks that store massive amounts of genomic data used to identify the genetic origins of cancer and other diseases. 

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 27, 2011

Nova completes $60M Clearwater Conference Center

Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners

| Dec 27, 2011

BD+C's Under 40 Leadership Summit update

The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

| Dec 27, 2011

State of the data center 2011

Advances in technology, an increased reliance on the Internet and social media as well as an increased focus on energy management initiatives have had a significant impact on the data center world.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021