flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Press pipe-joining provides valuable savings on potable water installation at Mercy Health – West Hospital

Sponsored Content Plumbing

Press pipe-joining provides valuable savings on potable water installation at Mercy Health – West Hospital

Nelson Stark selected Viega ProPress for the plumbing installation because the system is flameless and can be installed simultaneously with other utilities since there’s no need for welding or grooving equipment.


By Viega | February 22, 2017

Nelson Stark saved time with modular construction.

Nelson Stark used Viega ProPress® to install the plumbing for the construction of Mercy Health – West Hospital in Cincinnati. Plumbers installed a combination of Viega ProPress for stainless pipe and fittings with Viega ProPress copper fittings as well as transition fittings for potable water at the medical facility.

Nelson Stark selected Viega ProPress for the plumbing installation because the system is flameless and can be installed simultaneously with other utilities since there’s no need for welding or grooving equipment.

“Using Viega ProPress allowed us to complete the joining-effort installation with this modularly prepared, innovative type of construction,” said Jeff Read, Vice President at Nelson Stark. “The installers put together each run of pipe for the 150-foot corridors with the fittings, but didn’t press them. Once it was sized and laid out correctly, they attached the fittings to the racks so that when the racks arrived at the hospital construction site all our installers had to do was make the connections.”

The Viega ProPress systems use press fittings to make water-tight and air-tight connections in copper tubing and stainless steel piping. The patented Smart Connect® feature, on all Viega ProPress systems, ensures leak-free connections.

“The project called for 3" and 4" mains from the mechanical room, down the halls and up the entire building tower. From the mains into each room we installed copper tubing and fittings in 2" and smaller,” said Todd Elliot, Project Executive at Nelson Stark. Overall, the plumbing install required more than 3,800' of large-diameter 316 stainless steel pipe and approximately 900 Viega ProPress stainless steel fittings as well as approximately 7,500 Viega ProPress copper fittings and valves.

For West Hospital, Nelson Stark had 60 plumbers installing Viega ProPress in the pre-fabricated method for the main corridors and on site in the individual rooms and public restrooms at the facility.

“Being able to use the same tool to press both stainless steel and copper fittings was a huge benefit,” added Elliot. By using the same tool for stainless, copper and transition fittings, Nelson Stark’s installers saved time and were able to simplify the plumbing installation.

“It was our first time installing Viega ProPress with stainless steel and the hospital was being built on a very tight schedule,” said Wells. “Viega ProPress is obviously quicker from a labor standpoint.”

“There are some unquantifiable advantages that affect the schedule,” explained Read. “We get called because of our reputation to complete projects on or ahead of the schedule.”

“Our customer saved on costs by having fewer hours of labor and using cost-effective stainless,” explained Wells. “The fitting can be installed under flow conditions so there’s no time-consuming process of bleeding a line before doing maintenance work.”

“We’ve installed thousands of Viega ProPress fittings and we’ve had a really good experience in not having leaks,” Elliot added. “We appreciate the huge safety advantage that Viega ProPress provides.”

Click here to read more, or visit www.viega.us

 

ProPress was selected because it is flameless.

Tags

Related Stories

| Aug 11, 2010

AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report

A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

HNTB, Arup, Walter P Moore among SMPS National Marketing Communications Awards winners

The Society for Marketing Professional Services (SMPS) is pleased to announce the 2009 recipients of the 32nd Annual National Marketing Communications Awards (MCA). This annual competition is the longest-standing, most prestigious awards program recognizing excellence in marketing and communications by professional services firms in the design and building industry.

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

High-profit design firms invest in in-house training

Forty-three percent of high-profit architecture, engineering, and environmental consulting firms have in-house training staff, according to a study by ZweigWhite. The 2008-2009 Successful Firm Survey reports that only 36% of firms overall have in-house training staff. In addition, 52% of high-profit firms use an online training system or service.

boombox1
boombox2
native1

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021