flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

Reconstruction & Renovation

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.


By David Malone, Associate Editor | September 28, 2017
Aerial view of the Post Office redevelopment project with the green roof

Rendering courtesy of ©601w Companies | Gensler

Since 2016, nearly 100,000 man-hours have been invested in the Old Chicago Main Post Office to prep the building and the site for its planned redevelopment. 200 construction workers from 27 construction-related firms have been on site and removed an estimated 20 million pounds of debris. Now, 601W Companies and Gensler have revealed detailed plans for the redevelopment.

The plan is to position the building as “a world-class development for the future of business and commerce,” according to a press release. The redevelopment spans 2.8 million sf across three city blocks and five acres, making it the largest redevelopment project in the country.

 

Festival hall in the Chicago Post Office redevelopmentFestival Hall. Rendering courtesy of ©601w Companies | Gensler.

 

Over $600 million is being invested in the building, which will feature a large-scale festival food market that spills outside to a riverfront plaza, 250,000-sf floorplates with ceiling heights of 19 feet for use as office space, and a roof that will include over three acres of park space with cafes, sports courts, and a quarter-mile running trail. The estimated 15,000 tenants will also make use of over 80,000 sf of tenant amenities, including a fitness center, conference space, and lounge and entertainment space.

 

The fitness center in the Chicago Post Office redevlopmentThe fitness center. Rendering courtesy of ©601w Companies | Gensler.

 

Many of the original details of the building are being restored or retained as part of the redevelopment. The Post Master’s office, mail chutes and scales, the limestone exterior, and the Historic Lobby on Van Buren will all be carried through to the redesigned building.

“We intend to honor The Post Office’s past, bringing to life a vision that preserves the art deco design and history of the building while making way for progressive elements and updates that will resonate with the workforce of today and tomorrow,” says Brian Whiting, President of The Telos Group, which oversees strategic positioning and leasing of the office space, in a release.

 

The northeast plaza at the Chicago Post Office redevelopmentThe Northeast Plaza. Rendering courtesy of ©601w Companies | Gensler.

 

Leasing for the property is currently underway with an anticipated completion date set for early 2019. Future tenants will be able to begin building out space in 2018.

 

A bocce court and pool table in one of the tenant loungesA bocce court and pool tables on the second floor. Rendering courtesy of ©601w Companies | Gensler.

 

A library spaceLibrary. Rendering courtesy of ©601w Companies | Gensler.

 

Harrison Street south lobbyHarrison Street South Lobby. Rendering courtesy of ©601w Companies | Gensler.

Related Stories

| Feb 22, 2013

Westlake Reed Leskosky will renovate training center for Cleveland Browns

Local firm Westlake Reed Leskosky has been chosen to design renovations to the Cleveland Browns' Training and Administrative Complex in Berea, Ohio.

| Feb 20, 2013

Group of West Coast civil engineers developing building standards for tsunamis

A group of civil engineers from around the western U.S. is developing additions to the building code to address the threat of a tsunami.

| Feb 15, 2013

UC-Berkeley begins construction of art museum, film archive

The University of California-Berkeley has begun work on a $100 million project to turn a 1939 printing plant into the new Berkeley Art Museum and Pacific Film Archive.

| Feb 6, 2013

George W. Bush Presidential Center among award-winning roofing projects honored by Sika Sarnafil

Winners of the 2012 Contractor Project of the Year Competition were announced this week by Sika Sarnafil. The annual competition highlights excellence in roofing installation. Roofing contractors are judged based on project complexity, design uniqueness, craftsmanship, and creative problem solving.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021