flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Perkins+Will merges with Vermeulen Hind Architects, offically launches Perkins+Will Canada

Perkins+Will merges with Vermeulen Hind Architects, offically launches Perkins+Will Canada


May 2, 2011

Ontario, Canada April 28, 2011 – Ottawa and Hamilton (Dundas)-based Vermeulen Hind Architects, one of Canada’s leading healthcare architectural firms, has merged with Perkins+Will. Vermeulen Hind joins Toronto-based Shore Tilbe Perkins+Will, celebrated for its focus on civic and recreation architecture, and Vancouver-based Busby Perkins+Will, widely regarded as one of North America’s leading green practices, to create Perkins+Will Canada. The combination marks the official launch of Perkins+Will Canada, a merge that will establish the firm as among the pre-eminent interdisciplinary design practices in Canada.

“The Vermeulen Hind merger supports our strategy to grow by targeted acquisition, as it represents a pooling of expertise that will bring significant benefits to our global business by establishing a strong healthcare practice in Canada,” said Phil Harrison, Perkins+Will CEO.  “The establishment of Perkins+Will Canada provides us with a platform to harness our expertise into a national Canadian practice and combine it with the depth and global reach of the Perkins+Will brand.”

Founded in 1992, Vermeulen Hind has deep experience in designing specialized healthcare facilities, including cancer centers. The firm’s portfolio ranges from smaller, adaptive re-use and restoration projects to larger, multi-phase institutional transformations. Vermeulen Hind, along with Perkins+Will’s current Toronto office, will comprise the Ontario practice of Perkins+Will Canada.

“Each Perkins+Will Canada office shares a common philosophy of design excellence, and combining the knowledge, expertise and resources of our legacy firms will result in one of the strongest and most innovative architecture practices in North America,” said Fred Vermeulen Healthcare Market Sector Leader, Ontario. “By collaborating with our colleagues across Perkins+Will, we will be able to strengthen our offering and better meet the growing needs of our diverse client base.”

About Perkins+Will

Established in 1935, Perkins+Will is an integrated design firm serving clients from offices in Atlanta, Boston, Charlotte, Chicago, Dallas, Dubai, Dundas, Houston, London, Los Angeles, Miami, Minneapolis, New York, Orlando, Ottawa, Philadelphia, Research Triangle Park, San Diego, San Francisco, Seattle, Shanghai, Toronto, Vancouver, and Washington, D.C. The firm practices architecture, interiors, branded environments, planning + strategies, Preservation + Adaptive Reuse, and urban design for clients in the aviation + transit, corporate + commercial + civic, healthcare, higher education, K-12 education, science + technology and Sports + Recreation markets. Perkins+Will routinely ranks among the world’s top design firms and has received hundreds of awards, including the prestigious American Institute of Architects’ “Firm of the Year Award.” Social responsibility has been a driving philosophy at Perkins+Will since the firm’s beginnings in 1935. The firm has committed to the 1% Solution through Public Architecture, promising to donate time pro bono to non-profit organizations in need of design services. With more LEED Accredited Professionals than any design firm in North America, Perkins+Will is recognized as one of the preeminent sustainable design firm in the country. Perkins+Will was the first multi-office company to commit to the 2030 Challenge, in which the firm has pledged that all of their projects be designed to carbon neutrality by the year 2030.

About Vermeulen Hind Architects

Founded in 1992, the firm specializes in cancer center, healthcare and research facility design. The firm provides a full complement of comprehensive services – architecture, interior, urban and landscape design, and master and space planning – across two Ontario offices; one in Dundas and one in Ottawa.

Vermeulen Hind is bound by a common thread – to provide comfortable, healthy and stimulating experiences that celebrate life, promote wellness, contribute positively to community and heighten cultural awareness, all with a high degree of professionalism and social responsibility.

Tags

Related Stories

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 29, 2010

Renovating for Sustainability

Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021