flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Pearce Brinkley Cease + Lee joins Clark Nexsen

Pearce Brinkley Cease + Lee joins Clark Nexsen

The merger will provide key benefits for both firms and their clients.


By Clark Nexsen | March 29, 2013

As a result of this merger, Clark Nexsen will be comprised of a 550-plus, multi-discipline staff including architects, engineers (civil, structural, mechanical, electrical, and fire protection), interior designers, landscape architects, planners, and other support personnel.

The combined staff represents decades of expertise in educational, Department of Defense, government, corporate, cultural, industrial, recreational, commercial, healthcare, K-12, and environmentally sustainable design and engineering.

For Clark Nexsen, the merger allows the 93-year-old, internationally renowned A/E firm to confirm and enhance its pursuit of design excellence through PBC+L’s reputation for award-winning architectural projects. PBC+L has received 35 American Institute of Architects (AIA) design awards in just the last 10 years.

For PBC+L, a 68-year-old company that was ranked 15th in Architect magazine’s “Top 50 Firms in the Nation” in 2012, joining Clark Nexsen dramatically broadens the firm’s geographic reach, offers the opportunity to secure nationally significant projects, and provides top-tier in-house engineering services to current and future clients.

“Clients and staff from both firms will experience positive change as a result of the merger, “ said Christopher Stone, PE, F.NSPE, F.ASCE, President of Clark Nexsen. “In addition to a far deeper level of design services, our clients and our staff will benefit from our combined engineering, operations, resources, and infrastructure.”

Jeffrey Lee, FAIA, a principal with Pearce Brinkley Cease + Lee, added: “At the center of this decision is our common desire to underscore our commitment to design excellence and to offer clients an architecture and engineering firm recognized for exceptional, high performance design and professional services.”

Related Stories

Fire and Life Safety | May 27, 2015

7 bold applications and innovations for fire and life safety

BD+C’s roundup features colorful sprinklers for offices, hotels, museums; a fire-rated curtain wall at a transit hub in Manhattan; a combination CO/smoke detector; and more.

BIM and Information Technology | May 27, 2015

4 projects honored with AIA TAP Innovation Awards for excellence in BIM and project delivery

Morphosis Architects' Emerson College building in Los Angeles and the University of Delaware’s ISE Lab are among the projects honored by AIA for their use of BIM/VDC tools.

Healthcare Facilities | May 27, 2015

Rochester, Minn., looks to escape Twin Cities’ shadow with $6.5 billion biotech development

The 20-year plan would also be a boon to Mayo Clinic, this city’s best-known address.

BIM and Information Technology | May 26, 2015

Lego-like model building kit was created by an architect for architects

Arckit, as the system is called, was designed to a 1:48 scale, making it easy to create models accurate to the real-life, physical building projected.

BIM and Information Technology | May 26, 2015

Moore's Law and the future of urban design

SmithGroupJJR's Stephen Conschafter, urban designer and planner, discusses his thoughts on the 50th anniversary of Moore's Law and how technology is transforming urban design.

Architects | May 26, 2015

AIA design competition creates portable, temporary housing for the homeless

The winning design from the AIA's "A Safe Place" competition was built at the AIA convention in Atlanta and later donated to a local non-profit partner.

BIM and Information Technology | May 21, 2015

How AEC firms should approach BIM training

CASE Founding Partner Steve Sanderson talks about the current state of software training in the AEC industry and common pitfalls in AEC training.

Architects | May 20, 2015

Architecture billings remain stuck in winter slowdown

Regional business conditions continue to thrive in the South and West

University Buildings | May 19, 2015

Special Report: How your firm can help struggling colleges and universities meet their building project goals

Building Teams that want to succeed in the higher education market have to help their clients find new funding sources, control costs, and provide the maximum value for every dollar.

University Buildings | May 19, 2015

Renovate or build new: How to resolve the eternal question

With capital budgets strained, renovation may be an increasingly attractive money-saving option for many college and universities. 

boombox1
boombox2
native1

More In Category

Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021