flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Parking garages in N.Y. State will have to be inspected every three years

Codes and Standards

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.


By Peter Fabris, Contributing Editor | November 29, 2018

Owners of parking garages in New York State will soon be required to have the structure undergo a condition assessment by a qualified professional engineer every three years, according to Hoffmann Architects.

The new rule will require these assessments as early as next fall. An on-site structural evaluation is required, and the engineer must submit a condition assessment report to the governing authority, which could be the city, town, county, or other governmental unit.

All parking garages in the state including private, municipal, and state-owned facilities, are subject to this new code. This includes freestanding parking structures as well as portions of buildings, unless the only parking is on grade. Small garages for one- or two-family houses or townhouse units are exempt.

New parking garages must undergo an initial condition assessment before being issued a certificate of occupancy or certificate of compliance.

Related Stories

| Sep 15, 2011

Bill Seeks To Spur Stronger Building Codes Nationwide

The Safe Building Code Incentive Act of 2011 would provide strong financial incentives for states to adopt and enforce strong building codes.  

| Sep 15, 2011

New Federal Law Limits Amount of Formaldehyde in Wood

President Obama signed into law legislation that limits the amount of formaldehyde in wood. The new measure will impact particle board and other composite wood products .

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

| Sep 8, 2011

Revised Building Codes Adopted After WTC Attacks Being Implemented

U.S. National Institute of Standards and Technology (NIST) code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction including One World Trade Center, the lead building of the new World Trade Center complex. 

| Sep 8, 2011

New Sustainability Standard Addresses Disaster Resistance

To aid local governments to adopt high-performance green building codes, the Portland Cement Association (PCA) and the Institute for Business and Home Safety (IBHS) have developed High Performance Building Requirements for Sustainability 2.0. 

| Sep 8, 2011

Pilot ISO 50001 Implementations Report Big Energy Savings

The International Organization for Standardization (ISO) recently published ISO 50001 to provide a recognized framework for integrating energy performance into management practices. 

| Sep 8, 2011

USGBC Revises Energy Demand Response Credit

Originally launched in 2010, the revised and enhanced Demand Response Pilot Credit establishes guidelines that are anticipated to increase participation in automated energy demand response programs.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021