flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ozarks Technical Community College's advanced manufacturing center is first-of-a-kind in region

University Buildings

Ozarks Technical Community College's advanced manufacturing center is first-of-a-kind in region

The center will train a new workforce in advanced high tech, clean manufacturing and fabrication.


By Peter Fabris, Contributing Editor | January 27, 2023
The new Robert W. Plaster Center for Advanced Manufacturing at Ozarks Technical Community College
The new Robert W. Plaster Center for Advanced Manufacturing at Ozarks Technical Community College in Springfield, Mo., is designed to foster creativity, technology skills, technical expertise, teamwork, and collaboration. Photo courtesy Perkins and Will

The new Robert W. Plaster Center for Advanced Manufacturing at Ozarks Technical Community College in Springfield, Mo., is a first-of-a-kind educational asset in the region. The 125,000-sf facility will educate and train a new generation in high tech, clean manufacturing and fabrication.

Strong, metallic materials and geometric forms make up the shining facade, creating a modern, creative feel. Flexibility was a key goal of the program; thus, the Center is designed to be open, with tracks for movable walls to adjust to varying class sizes and new configurations.

The building’s core is a workshop high bay area, featuring more than 30,000 sf of active learning environments that are double- and triple-height, encased in steel and glass. This design element puts the work of students and industry partner collaboration on display.

These spaces are stocked with advanced equipment, including 3D printers, laser cutters, robotic welders, computer-aided lathes, mechatronics stations, and an overhead gantry crane.

First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Strong, metallic materials and geometric forms in the shining facade create a modern feel that reflects the skill being cultivated within. Photo courtesy Perkins and Will

Classrooms are arranged alongside the high bay for seamless transitions from class to lab, while the glass collaboration zones overlook a 500-foot-long high bay space that is leasable to relocating or start-up companies. This area fronts one of Springfield’s main thoroughfares.

The new facility occupies a long, skinny site, and needed to provide tractor trailer access at multiple points. This created a design challenge to fit in with the pedestrian-friendly campus.

Like stitches holding different pieces of fabric together, the places between academic spaces pull together the large, open spaces full of glass and steel with playful, warm wood details bringing warmth to quiet study spaces. The flexible design encourages and supports both short- and longer-term training opportunities with a range of learning environments, including:

  • Specialized hands-on learning environments
  • Customizable simulation training centers
  • Long-distance learning space
  • Research and development labs
  • Designated process-improvement space
  • Business incubation test centers
  • A large high-bay environment for industry-led projects.

A large assembly stair occupies the two-story lobby, flooded with daylight and equipped for presentations to large groups from busloads of middle school students to corporate investors.

On the project team:
Owner and/or developer: Ozarks Technical Community College
Design architect: Perkins and Will
Architect of record: Dake Wells Architecture
MEP engineers: Antella Consulting Engineers (electrical engineer); Henderson Engineers (mechanical, plumbing, fire protection engineer)
Structural engineer: J&M Engineering
General contractor/construction manager: Crossland Construction

First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Large assembly stair occupies the two-story lobby, flooded with daylight and equipped for presentations to large groups from busloads of middle school students to corporate investors. Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Core of the Center is a workshop high bay area, featuring more than 30,000 sf of active learning environments that are double- and triple- height, encased in steel and glass, putting the work of students and industry partner collaboration on display. Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will
First-of-its-kind advanced manufacturing center opens at Ozarks Technical Community College
Photo courtesy Perkins and Will

 

Related Stories

University Buildings | Feb 23, 2015

Future-proofing educational institutions: 5 trends to consider

In response to rapidly changing conditions in K-12 and higher education, institutions and school districts should consider these five trends to ensure a productive, educated future.

University Buildings | Feb 20, 2015

Penn strengthens campus security by reviving its surrounding neighborhood

In 1996, the University of Pennsylvania’s sprawling campus in Philadelphia was in the grip of an unprecedented crime wave. But instead of walling themselves off from their surrounding neighborhoods, the school decided to support the community.

University Buildings | Feb 18, 2015

Preparing for the worst: Campus security since Virginia Tech

Seven years after the mass shootings at Virginia Tech, colleges and universities continue to shake up their emergency communications and response capabilities to shootings and other criminal threats.

University Buildings | Feb 17, 2015

BD+C exclusive: How security is influencing campus design and construction

Campus crime—whether real or perceived—presents Building Teams with more opportunities for early-stage consultation with university clients. 

Architects | Feb 11, 2015

Shortlist for 2015 Mies van der Rohe Award announced

Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built. 

| Jan 7, 2015

University of Chicago releases proposed sites for Obama library bid

There are two proposed sites for the plan, both owned by the Chicago Park District in Chicago’s South Side, near the university’s campus in Hyde Park, according to the Chicago Sun-Times.

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021