flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oklahoma’s first modular hotel will begin construction next month

Modular Building

Oklahoma’s first modular hotel will begin construction next month

Guerdon Modular Buildings will produce 81 modules for this project. 


By John Caulfield, Senior Editor | May 17, 2016

The AC Hotel in a neighborhood in Oklahoma City will be Oklahoma's first modular-built hotel, as well as the first for its developer. Image: Courtesy Guerdon Modular Buildings 

NewcrestImage, a privately owned, Lewisville, Texas-based hotel development, construction, and management firm, plans to build the first hotel in Oklahoma to use modular construction technology.

The 142-room AC Hotel Bricktown, in Oklahoma City, will also be NewcrestImage’s first modular hotel. The developer has entered into a partnership with the manufacturer Guerdon Modular Buildings to produce the modules for this project.

ADG Inc. is the architect of record, and Duncan Miller Ullmann the interior designer of the five-story hotel. Metul Patel, NewcrestImage’s Chairman and CEO, describes the hotel’s accommodations as “European-inspired.”

The first floor will be built using traditional construction. The upper four floors will be built from 81 modules provided by Guerdon’s factory in Boise, Idaho. Modular production is scheduled to begin next month, and the finished modules are scheduled to be shipped, via flatbed trucks, over four days in October.

All rooms and finishes will follow AC Hotel specifications upon delivery, and be indistinguishable from the Marriott brand’s other hotels.

The hotel, which is scheduled to open in June 2017, and which NewcrestImage will own and operate, will be located next to the 13,000-seat Chicksaw Bricktown ballpark and within a few blocks of the Cox Convention Center.

(NewcrestImage is deploying conventional construction to build another hotel in the Bricktown neighborhood, this one a 135-room Hyatt Place, which will be adjacent to OKC’s Central Business District. It’s scheduled to open in late 2017.)

“Our goal has been to integrate closely with NewcrestImage in order to make every aspect of the construction process flawless and worry-free—everything from the design and build to mapping out the delivery and installation process,” said Lad Dawson, Guerdon’s CEO.

Earlier this year, BD+C quoted Dawson as stating that Guerdon had entered into an agreement to help “a large hotel chain” (Marriott, according to one knowledgeable source) build 1,000 modular hotel rooms per year. He did not provide specifics or timetables. But that same article quoted The Modular Building Institute and STR that more modular hotel construction in the U.S. is needed for hoteliers to keep up with rising demand from guests.

Related Stories

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| Mar 11, 2011

Temporary modular building at Harvard targets sustainability

Anderson Anderson Architecture of San Francisco designed the Harvard Yard childcare facility, a modular building manufactured by Triumph Modular of Littleton, Mass., that was installed at Harvard University. The 5,700-sf facility will remain on the university’s Cambridge, Mass., campus for 18 months while the Harvard Yard Child Care Center and the Oxford Street Daycare Coop are being renovated.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Aug 11, 2010

Morphosis builds 'floating' house for Brad Pitt's Make It Right New Orleans foundation

Morphosis Architects, under the direction of renowned architect and UCLA professor Thom Mayne, has completed the first floating house permitted in the U.S. for Brad Pitt’s Make It Right Foundation in New Orleans.The FLOAT House is a new model for flood-safe, affordable, and sustainable housing that is designed to float securely with rising water levels.

| Aug 11, 2010

Bovis Lend Lease, Webcor among nation's largest multifamily contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Multifamily Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

EwingCole to merge with healthcare specialist Robert D. Lynn Associates

EwingCole, a nationally recognized architectural, engineering, interior design, and planning firm with more than 320 professionals, today announced that it will combine its practice with Robert D. Lynn Associates of Philadelphia, a 40-person firm with a robust portfolio of healthcare projects. The combination will create the Delaware Valley¹s largest and most comprehensive firm with an emphasis on healthcare architecture, and a national scope and presence.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021