The North Academic Building and the Office of the Chief Medical Examiner (ME) at Oklahoma State University’s Center for Health Sciences has started construction. The project will relocate and upgrade services from multiple buildings currently in the center of campus and is the first phase of a master plan focused on health and advancement in research and education.
Initial programming and conceptual design for the building was completed in 2018. Once complete, the ME office will be one of only a few in the country that is directly and physically connected with an academic health center. The ME autopsy lab is unique to Oklahoma and will be among the most technologically advanced in the world specific to advanced postmortem diagnostic imaging.
The new elevator shaft provides an opportunity to tie the exterior aesthetic to the interior.
The new building will also house the Center for Rural Health, Center for Health Systems Innovation, and dedicated anatomy and neuroscience-anatomy laboratories. Additional amenities will include classroom, conference, study, and administration areas.
The project is slated for completion in fall 2022.
When complete, the ME office will be submitted for the National Associate of Medical Examiners (NAME) accreditation, which will rank it among the top ME offices in the nation.
Related Stories
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 14, 2012
Angelo State University opens doors to new recreation center expansion
Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.