flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An office building near DFW Airport is now home to two Alphabet companies

Office Buildings

An office building near DFW Airport is now home to two Alphabet companies

At 2999 Olympus, O’Brien Architects and Rogers-O’Brien Construction designed and built clients’ spaces to suit their needs.


By Novid Parsi, Contributing Editor | June 15, 2023
The 2999 Olympus office building near DFW Airport is now home to two Alphabet companies
All photos courtesy Rogers-O’Brien Construction

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

O’Brien Architects’ design of 2999 Olympus prioritizes tenant health and wellbeing with touchless entry, antimicrobial wraps on common area doors, a chilled water HVAC system, and air filtration systems in the elevators. Amenities include a coffee bar in the lobby and a fitness center with locker rooms and towel service. Employees also can access lakeside trails as well as outdoor parks and workspaces equipped with Wi-Fi. 

The building’s second and 10th floors provide balconies offering lake views. And its façade features precast panels with brick-inlays and a double-height canopy at the base.

Rogers-O’Brien Construction, which built 2999 Olympus, also completed the finish-out of three floors for clients Sahara Equity, Tamko, and Verily/Wing.

O’Brien Architects designed Verily’s space to include flexible workspaces, three client presentation rooms, and two fiber lines with one serving as backup. Security measures include card access and a lobby video camera that identifies each person. Verily’s space also features ceiling clouds made of felt, overhead wood beams, a café breakroom with booth seating, and a backlit LED wall with inset live moss.

On the Building Team:
Owner and developer: Billingsley Company
Design architect and architect of record: O’Brien Architects
MEP engineer (2999 Olympus): Blum Consulting Engineers, Inc.
MEP engineer (Verily): TD Industries and CESG
Structural engineer: Datum Engineers
Construction : Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

 

Related Stories

Retail Centers | May 18, 2015

ULI forecast sees clear skies for real estate over next three years

With asset availability declining in several sectors, rents and transactions should rise.

Office Buildings | May 18, 2015

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.

Office Buildings | May 17, 2015

Mountain View, Calif., denies development rights for Google campus master plan

Despite Google’s offer of new bike paths, wetlands restoration, and other perks, the city of Mountain View, Calif., denied the company the development rights to construct a grand new headquarters.

Sponsored | Coatings | May 14, 2015

Prismatic coatings accent the new Altara Center

This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping

Industrial Facilities | May 11, 2015

SOM-designed Manufacturing and Design Innovation Institute opens in Chicago

The new space will be a place for academia, industries, and civic bodies to collaborate.

Mixed-Use | May 10, 2015

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

High-rise Construction | May 6, 2015

Parks in the sky? Subterranean bike paths? Meet the livable city, designed in 3D

Today’s great cities must be resilient—and open—to many things, including the influx of humanity, writes Gensler co-CEO Andy Cohen. 

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

Office Buildings | May 6, 2015

Is the office lobby the workplace of the future?

Perkins+Will's Tony Layne discusses three key trends driving the shift to workplaces that offer greater flexibility and choice for employees.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021