flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An office building near DFW Airport is now home to two Alphabet companies

Office Buildings

An office building near DFW Airport is now home to two Alphabet companies

At 2999 Olympus, O’Brien Architects and Rogers-O’Brien Construction designed and built clients’ spaces to suit their needs.


By Novid Parsi, Contributing Editor | June 15, 2023
The 2999 Olympus office building near DFW Airport is now home to two Alphabet companies
All photos courtesy Rogers-O’Brien Construction

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

O’Brien Architects’ design of 2999 Olympus prioritizes tenant health and wellbeing with touchless entry, antimicrobial wraps on common area doors, a chilled water HVAC system, and air filtration systems in the elevators. Amenities include a coffee bar in the lobby and a fitness center with locker rooms and towel service. Employees also can access lakeside trails as well as outdoor parks and workspaces equipped with Wi-Fi. 

The building’s second and 10th floors provide balconies offering lake views. And its façade features precast panels with brick-inlays and a double-height canopy at the base.

Rogers-O’Brien Construction, which built 2999 Olympus, also completed the finish-out of three floors for clients Sahara Equity, Tamko, and Verily/Wing.

O’Brien Architects designed Verily’s space to include flexible workspaces, three client presentation rooms, and two fiber lines with one serving as backup. Security measures include card access and a lobby video camera that identifies each person. Verily’s space also features ceiling clouds made of felt, overhead wood beams, a café breakroom with booth seating, and a backlit LED wall with inset live moss.

On the Building Team:
Owner and developer: Billingsley Company
Design architect and architect of record: O’Brien Architects
MEP engineer (2999 Olympus): Blum Consulting Engineers, Inc.
MEP engineer (Verily): TD Industries and CESG
Structural engineer: Datum Engineers
Construction : Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

 

Related Stories

Office Buildings | Aug 19, 2015

Good design can combat open-office issues

Three tricks to maintain privacy and worker production in a cube-less world, according to GS&P's Jack E. Weber 

High-rise Construction | Aug 12, 2015

Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

Japanese architect Kengo Kuma designs tower with gradually rotating floor plates for Rolex's new office in Dallas.

Giants 400 | Aug 7, 2015

GOVERNMENT SECTOR GIANTS: Public sector spending even more cautiously on buildings

AEC firms that do government work say their public-sector clients have been going smaller to save money on construction projects, according to BD+C's 2015 Giants 300 report.

Giants 400 | Aug 6, 2015

GREEN BUILDING GIANTS: Green building movement hits a new plateau, but the underlying problems remain

Today, the green building movement is all about eliminating toxic substances in building materials and systems and, for manufacturers, issuing environmental and health product declarations. Whether these efforts will lead to healthier products and building environments remains an open question.

Codes and Standards | Aug 6, 2015

Difference in male-female thermal comfort is due to clothing, ASHRAE says

Women wear lighter clothing in the summer, so they tend to be cooler in air-conditioned rooms, according to the group.

Giants 400 | Aug 5, 2015

GIANTS 300 REPORT: Top 85 Office Sector Construction Firms

Turner, Structure Tone, and Gilbane top BD+C's ranking of the nation's largest office sector contractors and construction management firms. 

Giants 400 | Aug 5, 2015

GIANTS 300 REPORT: Top 75 Office Sector Engineering Firms

AECOM, Jacobs, and Burns & McDonnell head BD+C's ranking of the nation's largest office sector engineering and engineering/architecture firms. 

Giants 400 | Aug 5, 2015

GIANTS 300 REPORT: Top 135 Office Sector Architecture Firms

Gensler, HOK, and Perkins+Will top BD+C's ranking of the nation's largest office sector architecture and architecture/engineering firms. 

Giants 400 | Aug 5, 2015

OFFICE SECTOR GIANTS: Today’s workplace design must appeal to Millennials’ ‘activity-based’ lifestyle

Office market AEC Giants discuss the latest trends workplace design, and the state of the office construction sector.

Office Buildings | Jul 31, 2015

Design unveiled for Apple HQ visitor center

A glass-walled single-story building alongside the main office building in Cupertino, Calif., will be used as a visitor center.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021