flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York's first-ever public housing for visually-impaired begins upgrade

New York's first-ever public housing for visually-impaired begins upgrade

Many of the residents have lived in the building since it opened in 1980.


By Magnusson Architecture and Planning | June 10, 2014
Magnusson Architecture and Planning (MAP) and Associated Blind Housing Development Fund Corporation (Associated Blind HDFC) broke ground on a $38 million building upgrade at Selis Manor. Selis Manor is the first government-funded residence for the vision-impaired and disabled in New York City. Associated Blind HDFC manages the residence, which opened in 1980. The repairs and capital improvements are its first-ever building upgrades. The phased construction is set to be complete by 2016.
 
The 14-story building is located at 135 West 23rd Street in Manhattan. It has 205 studio, one-, and two-bedroom units. Amenities include a roof terrace, courtyard, bowling alley, fitness center, computer center, library, and auditorium.
 
The speakers at the ceremony were Brian Daniels, associate commissioner of the New York State Office of Children and Family Services: Commission for the Blind; Leroy Latiker III, underwriter-project manager of production and development at U.S. Department of Housing and Urban Development; Tony Saverese, Developer/Managing Agent at Associated Blind HDFC; Joyce Carrico, tenant association representative and resident at Selis Manor; E. Perry Winston, associate at Magnusson Architecture and Planning; and Joe Malewich, board member of Associated Blind HDFC.
 
All of the public spaces will be upgraded and a new entrance will be added. Each of the apartments will have new fixtures and finishes. The separate kitchens will be connected directly to the living areas of the residential units for better flow and circulation. The renovation includes a full MEP systems upgrade that will lower energy usage.
 
“This long-awaited renovation will improve the safety and quality of housing for Selis Manor’s residents,” said Tony Savarese, Developer/Managing Agent at Associated Blind HDFC. “It is always a challenge to renovate an occupied building, and it is even more complicated when the occupants are visually-impaired. We worked closely with MAP on a plan that will ensure the safety of all residents during construction.”
 
Residents are supported by U.S. Department of Housing and Urban Development (HUD)’s Housing Choice Voucher Program, also known as Section 8. Associated Blind HDFC will arrange for temporary living spaces for every tenant on a rotating basis. The phased construction will take place two floors at a time.
 
 

Touchable models

Many of the residents have lived in the building since it opened. During the design phase of the project, MAP created touchable models of the new apartment layouts. The models acted as three-dimensional aides that helped the visually-impaired residents understand the changes by touch. Using the models as a guide, MAP’s architects engaged the residents in the process. They also incorporated the residents’ suggestions into the renovations.
 
 
“MAP has designed all types of housing, ranging from market-rate to affordable, and everything in between,” said Magnus Magnusson, AIA, LEED AP, founding principal of MAP. “So we know how to address the unique needs of particular residents. Selis Manor is over 30 years old, and long overdue for an upgrade. When the renovation is complete, all residents will have high-quality amenities and a superior standard of living – the kind of housing that all New Yorkers need and deserve.”
 
 

Fewer hurdles

MAP’s design eases crowding, increases security, and separates residents and visitors. Currently, the one entrance is shared by 250 residents and the patrons of VISIONS, a not-for-profit that provides services, including meals and classes, for over 500 people each day.  This traffic causes congestion in the common areas of the ground floor. A new residents-only entrance will be protected with an electronic pass system. The other entrance will be for VISIONS patrons.
 
Scored terrazzo flooring will help residents navigate within the building. A path along the floor will guide residents toward elevators and indicate stair landings. A new guardrail along the south façade of the building facing 23rd Street will include Braille inserts describing the history of the residence that lead toward the entrance. MAP consulted with Chris Downey, a San Francisco-based architect who became blind at the age of 45.
 
The architects expect NYSERDA Multi-family Participation Program (MPP) certification for the project. EME Group provided MEP engineering and Nash Associates provided structural engineering. Rockport Mortgage Corp. and Forsyth Street Advisors helped secure financing for the project.
 
 
 
 
 
 

Related Stories

| Apr 28, 2014

Welcome to the Hive: OVA designs wild shipping container hotel for competition

Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 25, 2014

How the 'digital natives' will transform your Building Team

The newest generation to enter the workforce is like no other that has come before it. This cohort is the first to grow up with the Internet, mobile technologies, and an “always connected” lifestyle.

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

| Apr 25, 2014

6 winners selected for the Architectural League Prize

The Architectural League Prize, created in 1981, "recognizes exemplary and provocative work by young practitioners and provides a public forum for the exchange of their ideas," according to The Architectural League. 

| Apr 24, 2014

Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum

LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.

| Apr 23, 2014

Ahead of the crowd: How architects can utilize crowdsourcing for project planning

Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 23, 2014

Experimental bot transfers CAD plans onto construction sites

The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.

| Apr 23, 2014

Mean and Green: Top 10 green building projects for 2014 [slideshow]

The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021