A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years, GlobeSt.com reports.
This number is higher than the average construction cost hikes nationwide, which were 2.5% in 2013 and 3% in 2014.
Hospital construction is the most expensive, at $800-$950 per sf. Five-star hotels follow at $700-$800 per sf, and university buildings at $600-$850 per sf.
City construction company representatives are concerned that costs could continue to rise despite the recent plunge in oil prices, because essential trades such as curtain wall and cast-in-place concrete have been reported to be running out of capacity.
President of the New York Building Congress Richard T. Anderson says that the annual 5% increase rate should be a cause for concern to the city, even though a considerable portion of the recent increase in costs is the product of forces beyond the city's control. He called for the industry and government to look for ways to reduce the cost of construction and eliminate regulations and red tape, according to GlobeSt.com.
Related Stories
| Jul 19, 2012
Construction begins on military centers to treat TBI and PTS
First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.
| Jul 18, 2012
U.S. engineering firms set sail for foreign ports
Other E/EA Giants 300 firms are just dipping their toes into foreign waters, still looking for international business but choosing not to establish additional offices.
| Jul 18, 2012
Architecture giants spreading their wings
A/AE Giants 300 rankings reveal firms branching out globally, merging, adding services.
| Jul 18, 2012
Green expert Kats joins GreenWizard as an advisor
Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.
| Jul 18, 2012
Construction employment stagnates in June
Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.
| Jul 18, 2012
Legat & Kingscott relocates architecture/interior design office
Move enables the architecture/interior design firm to better serve its expanding clientele.
| Jul 18, 2012
Alcoa appoints Hunter Architectural Manager
Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.
| Jul 17, 2012
AIA and Architecture for Humanity select Disaster Response Grant recipients
Awards help each group implement their locally driven preparedness project in the second half of the year. Â
| Jul 17, 2012
KM/Plaza changes name to Plaza Construction
Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.
| Jul 17, 2012
Dr. Phillips Charities Headquarters Building receives LEED Silver
The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.