A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years, GlobeSt.com reports.
This number is higher than the average construction cost hikes nationwide, which were 2.5% in 2013 and 3% in 2014.
Hospital construction is the most expensive, at $800-$950 per sf. Five-star hotels follow at $700-$800 per sf, and university buildings at $600-$850 per sf.
City construction company representatives are concerned that costs could continue to rise despite the recent plunge in oil prices, because essential trades such as curtain wall and cast-in-place concrete have been reported to be running out of capacity.
President of the New York Building Congress Richard T. Anderson says that the annual 5% increase rate should be a cause for concern to the city, even though a considerable portion of the recent increase in costs is the product of forces beyond the city's control. He called for the industry and government to look for ways to reduce the cost of construction and eliminate regulations and red tape, according to GlobeSt.com.
Related Stories
| Jul 23, 2012
Venturi Scott Brown and Associates Becomes VSBA, LLC
After over fifty years as one of the world’s most renowned architects, Bob Venturi has retired from practice, while Denise Scott Brown continues to publish and present her work.
| Jul 23, 2012
Giants 300 Firm Index 2012
An alphabetical index of the Giants 300 AEC firms and their ranking in specific categories.
| Jul 23, 2012
Haynes Whaley announces leadership transition
Pronier has worked in the construction industry for the past 30 years.
| Jul 23, 2012
Missner Group completes construction of Chicago auto dealership
The Missner Group also incorporated numerous sustainable improvements to the property including the implementation of a vegetative roof, and the utilization of permeable pavers for the parking lot.
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 20, 2012
Data Centers Report: Demand ‘exploding’
BD+C's Giants 300 Top 25 AEC Firms in the Data Center sector.
| Jul 20, 2012
Office Report: Fitouts, renovations keep sector moving
BD+C's Giants 300 Top 25 AEC Firms in the Office sector.
| Jul 20, 2012
K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13
The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.
| Jul 20, 2012
Higher education market holding steady
But Giants 300 University AEC Firms aren’t expecting a flood of new work.
| Jul 20, 2012
3 important trends in hospital design that Healthcare Giants are watching closely
BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.