flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Univ. of Calif. Riverside business school building will support hybrid learning

University Buildings

New Univ. of Calif. Riverside business school building will support hybrid learning

Design-build project will integrate strong indoor-outdoor connections.


By Peter Fabris, Contributing Editor | November 2, 2022
UCR Business School ext
Courtesy University of California at Riverside.

A design-build partnership of Moore Ruble Yudell and McCarthy Building Companies will collaborate on a new business school building at the University of California at Riverside. The team was selected to design the new 63,000 sf building from a design competition. The structure is a key component for the school to accommodate rapidly growing enrollment—a 58% increase since 2015.

“This is the cornerstone in our plan to grow the UCR School of Business through new faculty, increased enrollment, and additional staff, and increase our engagement with the community through building a central hub for connection between business leaders, our research faculty, and our students,” said Yuzeng Wang, Dean of the Business School.

The new building will feature two 80-seat classrooms; a 350-seat auditorium; a computer lab; a studio to record podcasts, lectures, videos, and other media; study areas; a student lounge; 20 faculty offices; 59 administrative offices including one for the dean; a faculty and staff lounge; an executive meeting room, and group meeting rooms. It will also include state-of-the-art technology for hybrid learning, allowing lecturers to deliver multi-media presentations that can be recorded and streamed.

The structure will be the first new building in the south campus district, an area expected to see future growth. It has been designed to serve as a gateway and will integrate strong indoor-outdoor connections that harmonize the project to its site, district, and greater campus. A variety of outdoor spaces for student and faculty use as well as school events have been incorporated into the design.

“While the project supports future-oriented research and teaching, it is designed to be uniquely of its place, responsive to its site, campus, climate, and diverse student population,” said Jeanne Chen, FAIA, principal with Moore Ruble Yudell. “It respects its context and history while projecting boldly into the future, to support the school’s growth and leadership as an international center of excellence in business education and research.”

The project is scheduled to be completed by the fall semester of 2024. The business school at UCR is the largest in the University of California system.

On the Building Team:
Owner and/or developer: University of California Riverside
Design architect: Moore Ruble Yudell
Architect of record: Moore Ruble Yudell
MEP engineer: AEI Affiliated Engineers
Structural engineer: Coffman Engineers
General contractor/construction manager: McCarthy Building Companies

UCR Business School Ext 2
Courtesy University of California Riverside.
UCR Business School ext 3
Courtesy University of California Riverside.
UCR Business School int
Courtesy University of California Riverside.
UCR Business School int 2
Courtesy University of California Riverside.
UCR Business School int 3
Courtesy University of California at Riverside.
Courtesy University of California at Riverside.
Courtesy University of California at Riverside.

 

Related Stories

| May 1, 2014

First look: Cal State San Marcos's posh student union complex

The new 89,000-sf University Student Union at CSUSM features a massive, open-air amphitheater, student activity center with a game lounge, rooftop garden and patio, and ballroom space.

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Science, engineering find common ground on the Northeastern University campus [slideshow]

The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021