Professionals from Tishman Construction Corporation (TCC), an AECOM company, Leaders and Trustees of The New School, and hundreds of construction tradespeople celebrated the "topping out" of the University Center, marking the completion of vertical construction. Located at 65 Fifth Avenue between 14th and 13th Streets the 16-story University Center will provide a new focal point for The New School, which over the past decade has transformed into a major degree-granting university.
The University Center is The New School's largest-ever construction project, adding to the university's Greenwich Village campus 375,000-sf of classrooms, a library, an auditorium, a 608-bed student residence, and other facilities. Designed by SOM's award-winning architect Roger Duffy, the University Center will serve as a central meeting point for students and faculty across the university's disciplines, including art and design, liberal arts, social research, and the performing arts.
In addition, the University Center will be one of New York's greenest buildings, with a projected LEED Gold rating, and innovative sustainability features including a rainwater-saving green roof, for which The New School recently received a grant from the New York City Department of Environmental Protection. +
Related Stories
| Jun 1, 2012
AIA 2030 Commitment Program reports new results
The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.
| Jun 1, 2012
Robert Wilson joins SmithGroupJJR
Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.
| Jun 1, 2012
Gilbane Building's Sue Klawans promoted
Industry veteran tasked with boosting project efficiency and driving customer satisfaction, to direct operational excellence efforts.
| Jun 1, 2012
Ground broken for Children’s Hospital Colorado South Campus
Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.
| Jun 1, 2012
K-State Olathe Innovation Campus receives LEED Silver
Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.
| Jun 1, 2012
New York City Department of Buildings approves 3D BIM site safety plans
3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 31, 2012
8 steps to a successful BIM marketing program
It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.
| May 31, 2012
3 Metal Roofing Case Studies Illustrate Benefits
Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.
| May 31, 2012
AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.