Professionals from Tishman Construction Corporation (TCC), an AECOM company, Leaders and Trustees of The New School, and hundreds of construction tradespeople celebrated the "topping out" of the University Center, marking the completion of vertical construction. Located at 65 Fifth Avenue between 14th and 13th Streets the 16-story University Center will provide a new focal point for The New School, which over the past decade has transformed into a major degree-granting university.
The University Center is The New School's largest-ever construction project, adding to the university's Greenwich Village campus 375,000-sf of classrooms, a library, an auditorium, a 608-bed student residence, and other facilities. Designed by SOM's award-winning architect Roger Duffy, the University Center will serve as a central meeting point for students and faculty across the university's disciplines, including art and design, liberal arts, social research, and the performing arts.
In addition, the University Center will be one of New York's greenest buildings, with a projected LEED Gold rating, and innovative sustainability features including a rainwater-saving green roof, for which The New School recently received a grant from the New York City Department of Environmental Protection. +
Related Stories
| Jun 8, 2012
Allsteel names Kris Yates to head architectural products group
Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.
| Jun 8, 2012
Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex
Casaccio Yu Architects designed the 11,300-sf fitness and social complex.
| Jun 7, 2012
Waterline exhibition displays visions for re-thinking the Chicago River
The designs of Waterline showcase why the Chicago River should once again be considered the city’s most important asset and sets the stage for increased awareness, education and reinvention of the River.
| Jun 7, 2012
WDMA and FMA to affiliate and integrate operations
Over the coming months both organizations will begin the process of formalizing the details of the agreement for final approval by both organizations, with the formal change expected to take effect in January 2015.
| Jun 7, 2012
Craig joins Cannon Design as associate principal
Craig will work closely with the firm's Corporate/Commercial Interiors leadership to help facilitate initiatives that strengthen awareness around workplace innovation and offer counsel on strategic workplace decisions.
| Jun 7, 2012
Stantec publishes 2011 corporate Sustainability Report
Stantec's fifth annual Sustainability Report was prepared in accordance with the internationally recognized G3.1 Sustainability Reporting Guidelines, developed by the Global Reporting Initiative.
| Jun 6, 2012
KPF designs tower for Yongsan IBD
The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.
| Jun 6, 2012
SOM urges Chicago tenants to partner with landlords to cut energy use
Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.
| Jun 6, 2012
KLMK Group awarded contract with Parkland Health & Hospital System in Texas
KLMK will also provide planning guidance in all aspects of the project related to facility activation.
| Jun 5, 2012
Cannon Design joins forces with Peter Ellis New Cities
Peter Ellis will now lead Cannon Design's urban planning and city design practice in collaboration with the firm's executive leadership.