flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New renderings of the 1966 Century Plaza Hotel’s redevelopment

Hotel Facilities

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.


By David Malone, Associate Editor | January 30, 2017

Rendering courtesy of DBOX

Originally constructed in 1966, the Century Plaza Hotel is in the process of undergoing a redevelopment that will refurbish the hotel, eliminate about half of its 726 rooms, and add 63 residences. The space gained from eliminating a good portion of the rooms will be used to create 93,000 sf of commercial space on the hotel’s lower levels. 400 hotel rooms will remain on the upper floors.

Gensler is handling the interior renovation of the Century Plaza Hotel and Fairmont Hotels will operate it when completed. Fairmont is known for operating many luxury and historic hotels around the world.

The hotel redevelopment is part of the larger $2.5 billion Century Plaza project in Century City, Curbed Los Angeles reports. As part of this larger project, two new 46-story residential towers will rise behind the hotel. The towers, designed by Pei Cobb Freed, will have a combined total of 300 condominiums.

The Century Plaza project will also include a public, outdoor garden designed by Rios Clementi hale Studios, shops, and restaurants.

 

Rendering courtesy of DBOX.

 

Rendering courtesy of DBOX.

 

Rendering courtesy of DBOX.

Related Stories

Hotel Facilities | Feb 15, 2017

Morphosis redesigns Swiss hotel rooms as custom ‘aesthetic experiences’

The redesigned rooms focused on scale, color, tactility, unexpected form, and connections to the natural context.

Hotel Facilities | Jan 25, 2017

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Industry Research | Sep 28, 2016

Worldwide hotel construction shows modest year-over-year growth

Overall construction for hotel projects is up, but the current number of hotels currently being built has dipped slightly from one year ago.

Hotel Facilities | Sep 26, 2016

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.

Sponsored | Coatings | Sep 22, 2016

Valspar helps diversify new project amongst iconic downtown Chicago buildings

The 26-story hotel spanning 96,000 square-feet needed a way to not only differentiate itself among the sea of other hotels and buildings lining the riverfront and downtown area, but also fit into the mix aesthetically.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Sep 15, 2016

Developer reveals plans for 175-room hotel across from Wrigley Field

The hotel will provide a four-star experience to guests during baseball season and, just as importantly, during the offseason.

Hotel Facilities | Sep 7, 2016

Fish out of water: The site of a Birdseye frozen-food factory in Gloucester, Mass., transforms into a seaside hotel

The construction of this 94-room hotel and conference center pitted tourism proponents against locals who want to preserve this historic city’s fishing heritage. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021