The Bonita Springs (Fla.) High School will cost $14 million more than its original $50 million to complete. Rising costs of construction materials and labor are driving this overrun.
New York City’s School Construction Authority is over budget on more than half of its current projects by an aggregate of at least $300 million, including the construction of an annex to Public School 303 in Queens whose costs have nearly doubled to $98.6 million, from its initial budget of $53.9 million.
And this problem doesn’t just plague school districts, either. Construction costs comprise between 60% and 85% for commercial developments, and through the first half of this year those costs are up nationally by 5.7%, according to JLL. A number of studies, including one by McKinsey & Company last year, confirm that cost and schedule overruns have become the norm for the construction sector, jacking up the final price tags on projects, in some cases exponentially.
McKinsey noted that construction is among the least digitized of the 22 sectors it tracks. At the very least, there’s room in the construction sector for significant improvement in how costs are forecasted and project spending is managed.
Rider Levett Bucknall (RLB), a global consultant that specializes in cost and project management and quantity surveying, has recently developed a platform called Pulse that the firm claims is among the first to focus on the financial management of a project.
“A typical project will have anywhere from three to 100 contracts, with many potential changes,” explains Paul Brussow, RLB’s Executive Vice President. “This program allows [clients] to get to the bottom line of what a project is really going to cost.” By evaluating and calculating all costs—from engineering to legal—Brussow says Pulse can helps managers spot project risks sooner, and give them more information and time to devise contingencies.
Pulse complements RLB’s Ross 5D measurement and bill production software.
RLB will launch Pulse in November as an in-house service to its clients. It has already tested it on some projects (which Brussow declined to identify), and has started training employees in North America how to use it. The company will expand that training to other countries in the coming months.
“There’s a lot of interest within the company to deploy this software,” he says.
By the end of this year, says Brussow, Pulse should be able to manage a project’s cash flow and provide participating vendors with invoice management.
Related Stories
Projects | Mar 15, 2022
Old Sears store will become one of the largest orthopaedics outpatient facilities in the Northeast
A former Sears store in Rochester, N.Y., will be transformed into one of the largest orthopaedics outpatient facilities in the Northeast.
Projects | Mar 11, 2022
Studying science in the sky
In sharp contrast to other types of commercial real estate, the life sciences market is booming, according to SGA, an architecture firm based in Boston and New York that has extensive experience designing life sciences buildings.
Projects | Mar 11, 2022
Suffolk completes construction of luxury condominium 2000 Ocean
The 38-story glass-encased tower along the beach on 1.3 acres is owned by KAR Properties and designed by TEN Arquitectos.
Projects | Mar 10, 2022
Fort Worth’s Hotel Revel adds mixed-use spaces to creative neighborhood
Hotel Revel, a new mixed-use building in the Near Southside section of Fort Worth, Texas, will boost the vibrancy of the eclectic neighborhood.
Projects | Mar 10, 2022
Optometrist office takes new approach to ‘doc-in-a-box’ design
In recent decades, franchises have taken over the optometry services and optical sales market. This trend has spawned a commodity-type approach to design of office and retail sales space.
Projects | Mar 9, 2022
New 243-unit luxury apartment community opens in St. Paul, Minn.
Waterford Bay, a four-story, 243-unit luxury multifamily development recently opened in St. Paul, Minn.
Projects | Mar 9, 2022
Verizon Media’s New York studios serve multiple digital brands
Verizon Media, a division of Verizon Communications, Inc., embarked on a project to create a space to house multiple digital brands in Manhattan. The 21,700 sf space at 770 Broadway contains two broadcast studios and control rooms used by Verizon Media’s ecosystem of digital brands such as Yahoo, TechCrunch, HuffPost, RYOT, and MAKERS.
Mass Timber | Mar 8, 2022
Heavy timber office and boutique residential building breaks ground in Austin
T3 Eastside, a heavy timber office and boutique residential building, recently broke ground in Austin, Texas.
Performing Arts Centers | Mar 8, 2022
Cincinnati Ballet’s new center embodies the idea that dance is for everyone
Cincinnati Ballet had become a victim of its own success, according to company president and CEO Scott Altman. “We were bursting at the seams in our old building. We had simply outgrown the facility,” Altman told the Cincinnati Enquirer.
Projects | Mar 8, 2022
A scalable EV charging solution
Resembling a fueling station, VersiCharge XL—a new electric vehicle (EV) charging concept structure—can charge large numbers of EVs in outdoor areas ranging from small office building parking lots to last-mile logistics hubs to stadium parking lots.