The Bonita Springs (Fla.) High School will cost $14 million more than its original $50 million to complete. Rising costs of construction materials and labor are driving this overrun.
New York City’s School Construction Authority is over budget on more than half of its current projects by an aggregate of at least $300 million, including the construction of an annex to Public School 303 in Queens whose costs have nearly doubled to $98.6 million, from its initial budget of $53.9 million.
And this problem doesn’t just plague school districts, either. Construction costs comprise between 60% and 85% for commercial developments, and through the first half of this year those costs are up nationally by 5.7%, according to JLL. A number of studies, including one by McKinsey & Company last year, confirm that cost and schedule overruns have become the norm for the construction sector, jacking up the final price tags on projects, in some cases exponentially.
McKinsey noted that construction is among the least digitized of the 22 sectors it tracks. At the very least, there’s room in the construction sector for significant improvement in how costs are forecasted and project spending is managed.
Rider Levett Bucknall (RLB), a global consultant that specializes in cost and project management and quantity surveying, has recently developed a platform called Pulse that the firm claims is among the first to focus on the financial management of a project.
“A typical project will have anywhere from three to 100 contracts, with many potential changes,” explains Paul Brussow, RLB’s Executive Vice President. “This program allows [clients] to get to the bottom line of what a project is really going to cost.” By evaluating and calculating all costs—from engineering to legal—Brussow says Pulse can helps managers spot project risks sooner, and give them more information and time to devise contingencies.
Pulse complements RLB’s Ross 5D measurement and bill production software.
RLB will launch Pulse in November as an in-house service to its clients. It has already tested it on some projects (which Brussow declined to identify), and has started training employees in North America how to use it. The company will expand that training to other countries in the coming months.
“There’s a lot of interest within the company to deploy this software,” he says.
By the end of this year, says Brussow, Pulse should be able to manage a project’s cash flow and provide participating vendors with invoice management.
Related Stories
| Jul 14, 2014
Foster + Partners unveils triple-glazed tower for RMK headquarters
The London-based firm unveiled plans for the Russian Copper Company's headquarters in Yekaterinburg.
| Jul 11, 2014
First look: Jeanne Gang reinterprets San Francisco Bay windows in new skyscraper scheme
Chicago architect Jeanne Gang has designed a 40-story residential building in San Francisco that is inspired by the city's omnipresent bay windows.
| Jul 11, 2014
Are these LEGO-like blocks the future of construction?
Kite Bricks proposes a more efficient way of building with its newly developed Smart Bricks system.
| Jun 11, 2014
David Adjaye’s housing project in Sugar Hill nears completion
A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.
| Apr 8, 2014
Fire resistive curtain wall helps The Kensington meet property line requirements
The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
| Jan 28, 2014
2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs
Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry.
| Jan 21, 2014
2013: The year of the super-tall skyscraper
Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.
| Sep 23, 2013
Six-acre Essex Crossing development set to transform vacant New York property
A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.