The Bonita Springs (Fla.) High School will cost $14 million more than its original $50 million to complete. Rising costs of construction materials and labor are driving this overrun.
New York City’s School Construction Authority is over budget on more than half of its current projects by an aggregate of at least $300 million, including the construction of an annex to Public School 303 in Queens whose costs have nearly doubled to $98.6 million, from its initial budget of $53.9 million.
And this problem doesn’t just plague school districts, either. Construction costs comprise between 60% and 85% for commercial developments, and through the first half of this year those costs are up nationally by 5.7%, according to JLL. A number of studies, including one by McKinsey & Company last year, confirm that cost and schedule overruns have become the norm for the construction sector, jacking up the final price tags on projects, in some cases exponentially.
McKinsey noted that construction is among the least digitized of the 22 sectors it tracks. At the very least, there’s room in the construction sector for significant improvement in how costs are forecasted and project spending is managed.
Rider Levett Bucknall (RLB), a global consultant that specializes in cost and project management and quantity surveying, has recently developed a platform called Pulse that the firm claims is among the first to focus on the financial management of a project.
“A typical project will have anywhere from three to 100 contracts, with many potential changes,” explains Paul Brussow, RLB’s Executive Vice President. “This program allows [clients] to get to the bottom line of what a project is really going to cost.” By evaluating and calculating all costs—from engineering to legal—Brussow says Pulse can helps managers spot project risks sooner, and give them more information and time to devise contingencies.
Pulse complements RLB’s Ross 5D measurement and bill production software.
RLB will launch Pulse in November as an in-house service to its clients. It has already tested it on some projects (which Brussow declined to identify), and has started training employees in North America how to use it. The company will expand that training to other countries in the coming months.
“There’s a lot of interest within the company to deploy this software,” he says.
By the end of this year, says Brussow, Pulse should be able to manage a project’s cash flow and provide participating vendors with invoice management.
Related Stories
Affordable Housing | Aug 21, 2023
Essential housing: What’s in a name?
For many in our communities, rising rents and increased demand for housing means they are only one paycheck away from being unhoused. It’s time to stop thinking of affordable housing as a handout and start calling it what it is: Essential Housing.
Contractors | Aug 14, 2023
Fast-tracking construction projects offers both risk and reward
Understanding both the rewards and risk of fast-tracking a project can help owners, architects, engineers, and contractors maximize the benefits of this strategy and can bring great reward on all fronts when managed properly.
Multifamily Housing | Jul 31, 2023
6 multifamily housing projects win 2023 LEED Homes Awards
The 2023 LEED Homes Awards winners in the multifamily space represent green, LEED-certified buildings designed to provide clean indoor air and reduced energy consumption.
Office Buildings | Jun 28, 2023
When office-to-residential conversion works
The cost and design challenges involved with office-to-residential conversions can be daunting; designers need to devise creative uses to fully utilize the space.
Multifamily Housing | Jun 28, 2023
Sutton Tower, an 80-story multifamily development, completes construction in Manhattan’s Midtown East
In Manhattan’s Midtown East, the construction of Sutton Tower, an 80-story residential building, has been completed. Located in the Sutton Place neighborhood, the tower offers 120 for-sale residences, with the first move-ins scheduled for this summer. The project was designed by Thomas Juul-Hansen and developed by Gamma Real Estate and JVP Management. Lendlease, the general contractor, started construction in 2018.
Apartments | Jun 27, 2023
Dallas high-rise multifamily tower is first in state to receive WELL Gold certification
HALL Arts Residences, 28-story luxury residential high-rise in the Dallas Arts District, recently became the first high-rise multifamily tower in Texas to receive WELL Gold Certification, a designation issued by the International WELL Building Institute. The HKS-designed condominium tower was designed with numerous wellness details.
K-12 Schools | May 25, 2023
From net zero to net positive in K-12 schools
Perkins Eastman’s pursuit of healthy, net positive schools goes beyond environmental health; it targets all who work, teach, and learn inside them.
Office Buildings | May 15, 2023
Sixteen-story office tower will use 40% less energy than an average NYC office building
This month marks the completion of a new 16-story office tower that is being promoted as New York City’s most sustainable office structure. That boast is backed by an innovative HVAC system that features geothermal wells, dedicated outdoor air system (DOAS) units, radiant heating and cooling, and a sophisticated control system to ensure that the elements work optimally together.
Office Buildings | May 4, 2023
In Southern California, a former industrial zone continues to revitalize with an award-winning office property
In Culver City, Calif., Del Amo Construction, a construction company based in Southern California, has completed the adaptive reuse of 3516 Schaefer St, a new office property. 3516 Schaefer is located in Culver City’s redeveloped Hayden Tract neighborhood, a former industrial zone that has become a technology and corporate hub.
Mass Timber | May 3, 2023
Gensler-designed mid-rise will be Houston’s first mass timber commercial office building
A Houston project plans to achieve two firsts: the city’s first mass timber commercial office project, and the state of Texas’s first commercial office building targeting net zero energy operational carbon upon completion next year. Framework @ Block 10 is owned and managed by Hicks Ventures, a Houston-based development company.