flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New plans call for hundreds of thousands of British homes to be heated by factory machines

Sustainability

New plans call for hundreds of thousands of British homes to be heated by factory machines

An expansion of ‘heat networks’ is viewed as a possible means for Britain to accomplish its goal of slashing carbon emissions by 2050.


By David Malone, Associate Editor | September 7, 2016

Pixabay Public Domain

Waste not, want not. That’s how the saying goes, and it is a saying local authorities in England and Wales are taking to heart. In an effort to reach the countries' goal of slashing carbon emissions by 2050, new government-backed plans call for a huge expansion of “heat networks” that use warmth generated by industrial machinery, geothermal energy, and subway trains to heat homes, The Telegraph reports.

A heat network is, as it sounds, a large network of insulated pipes that transports hot water or steam to “heat exchanger” units in homes in order to heat up the mains water supply. Basically, the networks make use of heat that is produced as a waste by-product of commercial or industrial processes in order to replace less efficient domestic gas boilers.

Of the 381 local authorities in England and Wales, 131 of them are now working on some sort of heat network plan.

Islington, north London is planning to use heat generated from the Northern Line of the London Underground network while other locations are exploring using geothermal heat from deep beneath the earth's surface or even recycling heat from pottery kilns from the local ceramics industry.

In 2015, an additional £320 million was set aside to help fund the construction of up to 200 projects, which would produce enough heat to supply 400,000 homes.

There are still two main hurdles that need to be overcome for these plans to work, however. The first issue is in creating a viable business model for the rollout to millions of households. Currently, it is difficult to finance a project without securing customers, but it is difficult to secure customers for something that doesn’t yet exist.

The second issue is in figuring out how to deal with “customer protection, choice, and pricing” Richard Howard, Head of Energy and Environment at Policy Exchange says in an interview with The Telegraph. “Heat networks generally lock customers in on very long term contracts, which can be 15-20 years.” A contract that long may scare away potential customers.

While heat networks seem to offer a glimmer of hope for de-carbonizing heating supplies, it remains to be seen just how viable they will actually be once implementation begins.

Related Stories

Sports and Recreational Facilities | Nov 14, 2016

Soccer stadium from Zaha Hadid Architects will be constructed almost entirely of wood

The architects say the project will be the greenest soccer stadium in the world once completed.

Building Technology | Nov 10, 2016

New system from MIT may help buildings monitor stress and damage over time

The computational model is being tested on MIT’s Green Building.

Resiliency | Nov 3, 2016

Future-proofing urban waterfronts

CallisonRTKL’s Nathan Cherry discusses hurricanes, the San Francisco waterfront, and how we can future-proof our urban waterfronts.

Sustainability | Nov 3, 2016

A development in Denmark looks to use agricultural waste to help power its buildings

The proposal is a mixture of agriculture and urban design.

Multifamily Housing | Oct 25, 2016

The Beacon will become the most sustainable residential tower in the world

Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’

Urban Planning | Oct 20, 2016

Despite troubled development, Masdar City forges ahead

The detailed master plan for Phase 2 of Masdar City has been unveiled by CBT.

Green | Oct 12, 2016

Acting as a giant air purifier, this tower could help solve China’s pollution problem

The 23-ft tall tower operates almost entirely on wind energy.

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Green | Oct 4, 2016

The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative

Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021