flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The new Orange County Museum of Art will be Orange County’s largest center for arts and culture

Museums

The new Orange County Museum of Art will be Orange County’s largest center for arts and culture

Morphosis designed the building.


By David Malone, ASsociate Editor | June 1, 2018
View of the outdoor grand stair joining the museum to Argyros Plaza

Courtesy Morphosis Architects

The new Orange County Museum of Art (OCMA) is set to break ground in 2019 on its new 52,000-sf building. The new location will include 25,000 sf of exhibition galleries and 10,000 sf for education programs, performances, and public gatherings. Space for administrative offices, a gift shop, and a café will also be included.

Designed by Morphosis, the building’s main floor will be dedicated to reconfigurable open-span exhibition space. A mezzanine and street-front galleries that can accommodate temporary and permanent collection exhibitions will complement the first floor open-span exhibition space. Above the lobby atrium is a space for performance and education, illuminated by a full-height window overlooking a roof terrace.

 

View from Argyros Plaza of OCMA's main entranceCourtesy Morphosis Architects.

 

The roof terrace is equal in size to 70% of the building’s footprint and serves as an extension of the building’s galleries. Open-air spaces can be configured for installations, a sculpture garden, and outdoor film screenings.

The exterior of the building uses a façade of light-colored, undulating bands of metal paneling, glazed curtain wall, and exposed concrete to complement neighboring buildings. A grand public stair curves toward the entry and links the museum to Segerstrom Center for the Arts’ Argyros Plaza and the adjacent performing arts venues.

 

Atrium lobby and above performance spaceCourtesy Morphosis Architects.

 

“The building is a final puzzle piece for the campus at Segerstrom Center for the Arts, responding to the form of the neighboring buildings and energizing the plaza with a café and engaging public spaces. At the same time, the design also responds to a desire to enhance access to OCMA’s permanent collection through neutral, flexible exhibition spaces that can complement art of all media,” said Thom Mayne, Principal, Morphosis Architects, in a release.

The new OCMA building is slated for completion in 2021.

 

Ground floor mezzanine and galleriesCourtesy Morphosis Architects.

 

Roof terraceCourtesy Morphosis Architects.

Related Stories

| Aug 29, 2014

Phifer and Partners to design 'transparent' Museum of Modern Art in Warsaw

The design includes a stage that opens onto the city's Parade Square, so anyone passing by will be able to see performances. 

| Aug 25, 2014

Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]

Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.

| Aug 14, 2014

Museum of Mayan Culture draws inspiration from temple design [slideshow]

The Museo Maya de América in Guatemala City will be the world’s largest museum of Mayan history and culture, at 60,000 sf. 

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 23, 2014

Architecture Billings Index up nearly a point in June

AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.

| Jul 21, 2014

Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]

According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021