The new Orange County Museum of Art (OCMA) is set to break ground in 2019 on its new 52,000-sf building. The new location will include 25,000 sf of exhibition galleries and 10,000 sf for education programs, performances, and public gatherings. Space for administrative offices, a gift shop, and a café will also be included.
Designed by Morphosis, the building’s main floor will be dedicated to reconfigurable open-span exhibition space. A mezzanine and street-front galleries that can accommodate temporary and permanent collection exhibitions will complement the first floor open-span exhibition space. Above the lobby atrium is a space for performance and education, illuminated by a full-height window overlooking a roof terrace.
Courtesy Morphosis Architects.
The roof terrace is equal in size to 70% of the building’s footprint and serves as an extension of the building’s galleries. Open-air spaces can be configured for installations, a sculpture garden, and outdoor film screenings.
The exterior of the building uses a façade of light-colored, undulating bands of metal paneling, glazed curtain wall, and exposed concrete to complement neighboring buildings. A grand public stair curves toward the entry and links the museum to Segerstrom Center for the Arts’ Argyros Plaza and the adjacent performing arts venues.
Courtesy Morphosis Architects.
“The building is a final puzzle piece for the campus at Segerstrom Center for the Arts, responding to the form of the neighboring buildings and energizing the plaza with a café and engaging public spaces. At the same time, the design also responds to a desire to enhance access to OCMA’s permanent collection through neutral, flexible exhibition spaces that can complement art of all media,” said Thom Mayne, Principal, Morphosis Architects, in a release.
The new OCMA building is slated for completion in 2021.
Courtesy Morphosis Architects.
Courtesy Morphosis Architects.
Related Stories
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Biloxi’s new Maritime and Seafood Industry Museum is like a ship in a bottle
Nine years after the Museum of Maritime and Seafood Industry in Biloxi, Miss., was damaged by Hurricane Katrina’s 30-foot tidal surge, the museum reopened its doors in a brand new, H3-designed building.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 16, 2014
Shigeru Ban’s design wins Tainan Museum of Fine Arts competition
Pritzker Prize-winning architect Shigeru Ban has won an international competition organized by The Tainan Museum of Art in Taiwan. Ban's design features cascading volumes with an auditorium, classrooms, and exhibition galleries.
| Sep 15, 2014
Ranked: Top international AEC firms [2014 Giants 300 Report]
Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.
| Sep 15, 2014
Argentina reveals plans for Latin America’s tallest structure
Argentine President Cristina Fernández de Kirchner announces the winning design by MRA+A Álvarez | Bernabó | Sabatini for the capital's new miexed use tower.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 7, 2014
Behind the scenes of integrated project delivery — successful tools and applications
The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.