flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

An unused storage building transformed into lively space for students to immerse in STEM subjects


By Peter Fabris, Contributing Editor | August 8, 2024
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

A new K-12 STEM center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively K-12 school space for students to immerse themselves in STEM subjects.

Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. Designed and built by Pfluger Architects and Bartlett Cocke, the facility is accessible to all students in the district. It includes an open, flexible arena to host robotics competitions and a control room for students to manage cameras and audio during tournaments. The facility also includes a fabrication lab for metal and woodworking, classrooms for advanced engineering courses, and a maker space for elementary students to explore STEM subjects.

Large bay windows and overhead and sliding doors flood the spaces with natural light and create an inviting, open atmosphere. Each design element and material used throughout the space is thoughtfully crafted to support students’ curiosity and growth.

A partnership with Marathon Petroleum Corporation helped the district offset the cost of equipping the facility, creating a bridge between career and technical education and lucrative jobs in the industry. Marathon contributed $1 million to the project.

The facility has already hosted several competitions for the district’s award-winning robotics team and is hosting robotics camps for pre-K through 6th grade students this summer to expose young people to exciting STEM careers.

On the project team:
Owner and/or developer: Texas City Independent School District
Design architect: Pfluger Architects
Architect of record: Pfluger Architects
MEP engineer: DBR
Structural engineer: CSF Consulting
General contractor/construction manager: Bartlett Cocke

ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

 

Related Stories

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 22, 2013

School officials and parents are asking one question: Can design prevent another Sandy Hook? [2013 Giants 300 Report]

The second deadliest mass shooting by a single person in U.S. history galvanizes school officials, parents, public officials, and police departments, as they scrambled to figure out how to prevent a similar incident in their communities. 

| Jul 22, 2013

Top K-12 School Sector Construction Firms [2013 Giants 300 Report]

Gilbane, Balfour Beatty, Turner top Building Design+Construction's 2013 ranking of the largest K-12 school sector contractors and construction management firms in the U.S.

| Jul 22, 2013

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

AECOM, URS, STV top Building Design+Construction's 2013 ranking of the largest K-12 school sector engineering and engineering/architecture firms in the U.S.

| Jul 22, 2013

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 19, 2013

Best in brick: 7 stunning building façades made with brick [slideshow]

The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here are seven winning projects that caught our eye. 

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021