flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

An unused storage building transformed into lively space for students to immerse in STEM subjects


By Peter Fabris, Contributing Editor | August 8, 2024
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

A new K-12 STEM center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively K-12 school space for students to immerse themselves in STEM subjects.

Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. Designed and built by Pfluger Architects and Bartlett Cocke, the facility is accessible to all students in the district. It includes an open, flexible arena to host robotics competitions and a control room for students to manage cameras and audio during tournaments. The facility also includes a fabrication lab for metal and woodworking, classrooms for advanced engineering courses, and a maker space for elementary students to explore STEM subjects.

Large bay windows and overhead and sliding doors flood the spaces with natural light and create an inviting, open atmosphere. Each design element and material used throughout the space is thoughtfully crafted to support students’ curiosity and growth.

A partnership with Marathon Petroleum Corporation helped the district offset the cost of equipping the facility, creating a bridge between career and technical education and lucrative jobs in the industry. Marathon contributed $1 million to the project.

The facility has already hosted several competitions for the district’s award-winning robotics team and is hosting robotics camps for pre-K through 6th grade students this summer to expose young people to exciting STEM careers.

On the project team:
Owner and/or developer: Texas City Independent School District
Design architect: Pfluger Architects
Architect of record: Pfluger Architects
MEP engineer: DBR
Structural engineer: CSF Consulting
General contractor/construction manager: Bartlett Cocke

ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

 

Related Stories

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 4, 2013

K-12 school design that pays off for students

More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.

| Sep 3, 2013

'School in a box' project will place school in San Diego public library

Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 14, 2013

Five projects receive 2013 Educational Facility Design Excellence Award

The American Institute of Architects (AIA) Committee on Architecture for Education (CAE) has selected five educational and cultural facilities for this year’s CAE Educational Facility Design Awards.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Aug 12, 2013

New York’s first net-zero school will be a sustainability lab for city school system

An elementary school on Staten Island will be the first net-zero energy school in New York City and the Northeast. The school is designed to use half the energy of a typical New York public school. Construction will be completed in 2015.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021