flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New guidelines for replacing windows without removing exterior brick veneer

Reconstruction & Renovation

New guidelines for replacing windows without removing exterior brick veneer

The guidelines cover residential and light commercial buildings of less than four stories above grade.


By Peter Fabris, Contributing Editor | October 26, 2020
New guidelines for replacing windows without removing exterior brick veneer

Photo: Pexels via Pixabay

   

The Fenestration Manufacturers Association (FMA), the Fenestration and Glazing Industry Alliance (FGIA), and the Window & Door Manufacturers Association (WDMA) have released a new document focused on replacement windows.

FMA/AAMA/WDMA 2710-20, Guidelines for the Full Frame Replacement of Windows without Removal of Exterior Brick Veneer covers windows replacement in residential and light commercial buildings of not more than three stories above grade. It pertains to structures using a membrane/drainage system, a surface barrier drainage, or a wall system without a reliable membrane drainage system.

The document is focused on the full frame replacement without removal of external brick veneer. It describes methods where the cavity between the wall and façade needs to be blocked and sealed.

“This newly document is the first installation practice to address this window-wall condition, which also includes a 'decision-tree' matrix to guide installers to the most appropriate methods,” said Jim Katsaros (DuPont Performance Building Solutions), co-chair of the Joint Replacement Window Task Group. “The task group evaluated numerous configuration variations and completed representative installations with comprehensive field testing in actual homes in Baton Rouge, Louisiana.”

Related Stories

| Mar 11, 2011

Holiday Inn reworked for Downtown Disney Resort

The Orlando, Fla., office of VOA Associates completed a comprehensive interior and exterior renovation of the 14-story Holiday Inn in the Downtown Disney Resort in Lake Buena Vista, Fla. The $25 million project involved rehabbing the hotel’s 332 guest rooms, atrium, swimming pool, restaurant, fitness center, and administrative spaces.

| Mar 11, 2011

Blockbuster remodel transforms Omaha video store into a bank

A former Hollywood Video store in Omaha, Neb., was renovated and repurposed as the SAC Federal Credit Union, Ames Branch. Architects at Leo A Daly transformed the outdated 5,000-sf retail space into a modern facility by wrapping the exterior in poplar siding and adding a new glass storefront that floods the interior with natural light.

| Mar 11, 2011

Historic McKim Mead White facility restored at Columbia University

Faculty House, a 1923 McKim Mead White building on Columbia University’s East Campus, could no longer support the school’s needs, so the historic 38,000-sf building was transformed into a modern faculty dining room, graduate student meeting center, and event space for visiting lecturers, large banquets, and alumni organizations.

| Feb 15, 2011

Iconic TWA terminal may reopen as a boutique hotel

The Port Authority of New York and New Jersey hopes to squeeze a hotel with about 150 rooms in the space between the old TWA terminal and the new JetBlue building. The old TWA terminal would serve as an entry to the hotel and hotel lobby, which would also contain restaurants and shops.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021