flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New guide for installation of mineral fiber pipe insulation on chilled water systems

Codes and Standards

New guide for installation of mineral fiber pipe insulation on chilled water systems

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation. 


By Peter Fabris, Contributing Editor | July 27, 2015
New guide for installation of mineral fiber pipe insulation on chilled water systems

Photo: Steve Jurvetson, Creative Commons

The North American Insulation Manufacturers Association (NAIMA) has issued a new publication, “Guide to Insulating Chilled Water Piping Systems With Mineral Fiber Pipe Insulation.” 

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation.

"Insulation systems are critical to limiting heat losses and preventing condensation on pipe surfaces operating from 33 degrees F to 60 degrees F (0.5 degrees C to 15.6 degrees C) within conditioned spaces in commercial and institutional buildings," says Charles Cottrell, vice president technical services for NAIMA. "When poorly applied, however, an insulation system can compromise insulation effectiveness.” 

“NAIMA developed this step-by-step guide for applying vapor-sealed mineral fiber pipe insulation, which when installed according to the guide's recommendations, can effectively control condensation, help extend the life of the insulation system, and save energy," Cottrell says.

The guide addresses the installation of standard ASJ jacketed pipe insulation and presents recommendations based on reliable engineering principles and research, as well as consultation with manufacturers, contractors, and industry experts.

It details insulation application on straight pipe; on pipe system fittings including flanges, couplings, elbows, tees, and valves; and on 45- and 90-degree elbows.  Also included are details on vapor dams, pipe supports, and field-applied jackets.

Other sections include performance criteria, a guide specification, and installation checklist. Click here to download a free copy of the guide.

Related Stories

Codes and Standards | Sep 30, 2021

U.S. has a deficit of 5 million homes

Builders unable to keep pace with demand.

Codes and Standards | Sep 29, 2021

Mass Timber group study will compare structural round timber to glulam products and steel

Will compare costs, capabilities, and carbon impacts of structural materials.

Codes and Standards | Sep 28, 2021

Massachusetts creates Commission on Clean Heat

First-of-its kind body to set targets for buildings to reduce emissions from heating fuels.

Codes and Standards | Sep 27, 2021

Commercial real estate industry faces SEC climate disclosure regulations

Risks associated with climate change would have to be revealed.

Codes and Standards | Sep 22, 2021

Group proposes Carbon Use Intensity metric for new buildings

Plan would track embedded carbon on projects.

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

Codes and Standards | Sep 15, 2021

USGBC will change leaders, conduct strategic review

Aims to ensure organization is ‘well positioned to scale its work in the post-pandemic world’.

Codes and Standards | Sep 15, 2021

LEED-certified offices earn higher rents than non-sustainable properties

Are also more resilient to dips in real estate market.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021