flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Facility completes at Drexel University College of Medicine at Tower Health

University Buildings

New Facility completes at Drexel University College of Medicine at Tower Health

SLAM designed the project.


By David Malone, Managing Editor | January 6, 2022
Drexel main entrance
Photos: SLAM

A new 180,000-sf, six-story facility has completed at the Drexel University College of Medicine at Tower Health in Wyomissing, Penn.

The new facility features enhanced teaching and learning environments with appropriately sized instructional labs, five simulation in-patient rooms, one surgery simulation room, 12 clinical training exam rooms, and an anatomy laboratory. The simulation training will afford students the opportunity to test their knowledge and complex decision-making skills.

Drexel Atrium

Academic life will be balanced by a student life experience that promotes health and wellness through access to a fitness center with indoor and outdoor recreation space. Students will also have access to the Information Commons, a lounge area, a game room, and a cafe.

Drexel interior

Spaces were designed with flexibility and technology to reconfigure as medical education, research, innovation, and collaboration evolves. The facility offers an open environment with “touchdown space” to encourage staff and faculty from other locations to stay and work at the building. Large, open general purpose space, including a 120-seat auditorium, is available for receptions, donor events, and graduations.

SLAM’s integrated team provided full architectural design services, programming/planning, interior design, structural engineering, and landscape architecture.

Cantilevered edge of new Drexel building

Related Stories

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Oct 8, 2013

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior.

| Oct 7, 2013

10 award-winning metal building projects

The FDNY Fireboat Firehouse in New York and the Cirrus Logic Building in Austin, Texas, are among nine projects named winners of the 2013 Chairman’s Award by the Metal Construction Association for outstanding design and construction.

| Oct 1, 2013

13 structural steel buildings that dazzle

The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021