flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Codes and Standards

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.


By Peter Fabris, Contributing Editor | October 16, 2017
Documents
Documents

The updated AIA 2017 project contract documents include a new, comprehensive insurance exhibit that will allow for easier, more frequent updates as conditions in the insurance market change.

The insurance exhibit is intended to be used in conjunction with the A101–2017, A102–2017, and A103–2017 contract documents. One goal of the document’s drafters was to make it easier for users to transmit the insurance exhibit to the user’s insurance advisor or broker for evaluation and completion. AIA says the new insurance exhibit will allow changes to be made without having to revise the General Conditions document.

The insurance exhibit requires either the owner or the contractor to purchase property insurance written on a builder's risk “all-risks” completed value or equivalent policy form. It should be of an amount that can cover the total value of the entire project on a replacement cost basis. If the project is a remodeling of an existing structure or addition to one, the property insurance must also cover the existing structure against physical loss or damage on a replacement cost basis.

The insurance must be maintained through substantial completion and continued or replaced through the contractor’s one-year period for correction of the work. The insurance must include the interests of the owner, contractor, subcontractors, and sub-subcontractors, and the interests of mortgagees as loss payees.

In addition to the required property coverage, the agreement may include optional extended property insurances that the owner will purchase and maintain. This could include

Ordinance or Law Insurance; Expediting Cost Insurance; and Loss of Use, Business Interruption, and Delay in Completion Insurance.

For more information, visit: www.aiacontracts.org.

Related Stories

| Feb 7, 2014

New LEED Dynamic Plaque system will measure building performance

The U.S. Green Building Council recently unveiled the LEED Dynamic Plaque, which is a new system designed for benchmarking and comparing post-occupancy building performance on a global scale.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

EPA, Freddie Mac collaborate on energy- and water-efficient apartments

Freddie Mac will gather data on energy and water use from property owners, and encourage lenders to spend on energy-efficient investments for multifamily housing. 

| Feb 7, 2014

ASHRAE releases new refrigerant standards

The 2013 editions of ASHRAE’s major refrigerants-related standards, incorporating 41 new addenda, have been published.

| Feb 7, 2014

Ohio legislature moves to bar LEED standards on state projects

The use of LEED standards is being barred for public construction in Ohio under a state senate resolution.

| Jan 31, 2014

Center for Environmental Innovation in Roofing releases solar panel racking criteria for asphalt shingle roof systems

The Center for Environmental Innovation in Roofing’s PV Taskforce is releasing the first public draft of PV Racking and Attachment Criteria for Effective Asphalt Shingle Roof System Integration for an initial round of public comment.

| Jan 31, 2014

Developers are exceeding LEED standards for marketing purposes

Using LEED certification as a marketing tool is perceived by developers to be a successful tool, and this has pushed them to go above the minimum requirements at each level of certification, according to a study in the Environmental Science & Technology journal.

| Jan 31, 2014

OSHA extends feedback period for disclosure of workplace injuries proposal

The Occupational Safety and Health Administration said it would extend the comment period for a proposal that would require employers to submit electronic reports of workplace injuries and illnesses.

| Jan 31, 2014

DOE releases new efficiency standards for halide lamps

The Energy Department has finalized new energy efficiency standards for metal halide lamp fixtures, which are used in lighting for big box stores and parking lots.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021