The updated AIA 2017 project contract documents include a new, comprehensive insurance exhibit that will allow for easier, more frequent updates as conditions in the insurance market change.
The insurance exhibit is intended to be used in conjunction with the A101–2017, A102–2017, and A103–2017 contract documents. One goal of the document’s drafters was to make it easier for users to transmit the insurance exhibit to the user’s insurance advisor or broker for evaluation and completion. AIA says the new insurance exhibit will allow changes to be made without having to revise the General Conditions document.
The insurance exhibit requires either the owner or the contractor to purchase property insurance written on a builder's risk “all-risks” completed value or equivalent policy form. It should be of an amount that can cover the total value of the entire project on a replacement cost basis. If the project is a remodeling of an existing structure or addition to one, the property insurance must also cover the existing structure against physical loss or damage on a replacement cost basis.
The insurance must be maintained through substantial completion and continued or replaced through the contractor’s one-year period for correction of the work. The insurance must include the interests of the owner, contractor, subcontractors, and sub-subcontractors, and the interests of mortgagees as loss payees.
In addition to the required property coverage, the agreement may include optional extended property insurances that the owner will purchase and maintain. This could include
Ordinance or Law Insurance; Expediting Cost Insurance; and Loss of Use, Business Interruption, and Delay in Completion Insurance.
For more information, visit: www.aiacontracts.org.
Related Stories
| Jan 10, 2014
What the states should do to prevent more school shootings
To tell the truth, I didn’t want to write about the terrible events of December 14, 2012, when 20 children and six adults were gunned down at Sandy Hook Elementary School in Newtown, Conn. I figured other media would provide ample coverage, and anything we did would look cheap or inappropriate. But two things turned me around.
| Jan 8, 2014
Strengthened sprinkler rules could aid push for mid-rise wood structures in Canada
Strengthened sprinkler regulations proposed for the 2015 National Building Code of Canada (NBCC) could help a movement to allow midrise wood structures.
| Jan 8, 2014
New materials should help boost sustainability in cities by 2020
Newer developments include windows made with nano-crystals that control intense heat penetration while lighting living areas from the outside.
| Jan 8, 2014
Architect sentenced to a year in jail for firefighter's death
Architect Gerhard Becker was sentenced to a year in LA county jail after pleading no contest to the manslaughter of a firefighter who died while trying to contain a fire in a home the architect had designed for himself.
| Jan 8, 2014
United Association, NRDC seek major plumbing code changes
Proposed changes include mandating the insulation of hot water piping in new buildings.
| Jan 2, 2014
EPA move to assert oversight on small bodies of water among top regulatory battles for 2014
The EPA has started the process of declaring that it has the power to regulate streams, brooks, and small ponds.
| Jan 2, 2014
Paseo Verde in Philadelphia is nation’s first LEED Platinum neighborhood development
Paseo Verde, a mixed-use, mixed-income community hosted a ribbon cutting ceremony last month.
| Jan 2, 2014
Green infrastructure prominent in Akron, Ohio's sewer plans
City officials in Akron, Ohio want to prevent stormwater from entering its combined sewer system through the use of green infrastructure.
| Jan 2, 2014
OSHA to hold public meeting on proposed rule to improve tracking of workplace injuries
The Occupational Safety and Health Administration (OSHA) has scheduled a public meeting to allow interested parties to comment on the proposed rule to improve tracking of workplace injuries and illnesses.
| Jan 2, 2014
Measuring whole building energy use among big changes in LEED v4
A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC.