flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New commercial building energy code released

Contractors

New commercial building energy code released

The update includes a new compliance path and significant technical changes affecting building envelope, and mechanical and lighting systems. 


By Peter Fabris, Contributing Editor | December 22, 2016

Photo: Elizabeth Anderson via flickr

The 2016 version of ANSI/ASHRAE/IES Standard 90.1, the Energy Standard for Buildings Except Low-Rise Residential Buildings, was recently released.

The update includes a new compliance path and significant technical changes affecting building envelope, and mechanical and lighting systems. The document contains 121 new addenda since publication of the previous version: the 2013 standard.

The 2016 edition contains a new compliance path, the Performance Rating Method, which is included in Appendix G. The provision was previously used only to rate “beyond code” performance of buildings; it now serves as an alternative to the traditional performance path.

Among the most significant technical changes are:

Envelope:
• Mandatory requirements for envelope verification, supporting reduced air infiltration, and increased requirements for air leakage to overhead coiling doors.
• More stringent prescriptive requirements for metal building roofs and walls, fenestration, and opaque doors. 
• Improved clarity of exterior walls definitions, building orientation, and clarity around the effective R-value of air spaces.
• New requirements based on the addition of climate zone 0.

Lighting:
• Modified control requirements to simplify advanced lighting control applications.
• New exterior and interior lighting power densities based on LED technology.
• Requirements for dwelling units to set limits on light source efficacy.
• Additional controls for lighting in parking areas.

Mechanical:
• Chilled water plant metering, requiring large electric driven chilled water plants to be monitored for electric energy use and efficiency.
• DOAS requirements, adding efficiency and rating requirements for dedicated outside air systems.
• Elevator efficiency, introducing requirements for identifying usage category and efficiency class.
• Economizer fault detection and diagnostics, implementing monitoring system requirements for air-cooled DX cooling units with economizers, helping to ensure that equipment is working properly.
• New requirements for replacement equipment, such as adding economizers or fan speed control, which previously only applied to new installations.

More information on code adoption and related technical assistance is available at energycodes.gov.

Related Stories

| May 13, 2014

J. Vinton Schafer & Sons initiates leadership transition

J. Vinton Schafer & Sons, Inc., a Quandel Enterprises Company, announced today that Ronald E.  Knowles, P.E., who has served as president of the firm for 20 years, has transitioned to chairman and CEO, and the company has appointed Warren L. Hamilton as its new president.

| May 13, 2014

Kevin MacClary named VP of Foulger-Pratt Contracting

Foulger-Pratt Contracting, Rockville, Md., has promoted Kevin MacClary to VP.

| May 13, 2014

China Construction America acquires Plaza Construction

China State Construction Engineering Corp., China’s largest construction company, has made a significant investment in a U.S. construction firm closing the deal for an undisclosed amount to acquire Plaza Construction.

| May 13, 2014

Karl Kreutziger named President of Driver SPG

 C.W. Driver– a premier builder serving California since 1919 – has promoted Karl Kreutziger to president of Driver SPG, the company’s Anaheim, Calif.-based construction affiliate.

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 13, 2014

Libeskind wins competition to design Canadian National Holocaust Monument

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.

| May 11, 2014

8 starter questions to answer when thinking about building

So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT

| May 8, 2014

Don’t bother planning for the future - it doesn’t care about you

Though strategic planning has helped many businesses move forward, its time has passed. So says Economist and Author Bill Conerly. SPONSORED CONTENT

| May 8, 2014

Infographic: 4 most common causes of construction site fatalities

In honor of Safety Week, Skanska put together this nifty infographic on how to prevent deadly harm in construction. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021