flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New co-working space will focus on serving local, African-American youth in Miami

Reconstruction & Renovation

New co-working space will focus on serving local, African-American youth in Miami

The new space has been dubbed ‘Tribe.’


By David Malone, Associate Editor | January 23, 2018
Co-working space in Tribe

Photo: Catalina Ayubi

McKenzie, a boutique design, build, and custom fabrication firm recently completed the renovation of the two-story, 3,700-sf New Providence Lodge building in the Overtown neighborhood of Miami.

The building, which once housed a Freemason chapter during the Jim Crow era, is now the Tribe Urban Innovation Lab and Cowork, a multi-use, co-working space with a maker lab, classrooms, and collaborative event and hangout spaces. The idea is for the new space to primarily serve local, African-American youth.

 

Office space in TribePhoto: Catalina Ayubi.

 

Many of the building’s original features were preserved, such as the original wood ceiling and steel beams. These restored historical elements add a visual contrast to the collaborative workspace’s clean and modern finishes.

 

Photo: Catalina Ayubi.

 

Tribe comprises seven offices, several conference rooms, classrooms, a library, a common area, and a kitchen. Additionally, Tribe will house Code Fever and BlackTech Week, two nonprofit organizations that help build and diversify startup ecosystems and support African-American entrepreneurs.

Tribe is set to open at the end of January.

 

Kitchen in TribePhoto: Catalina Ayubi.

Related Stories

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021