flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New California energy code requires building systems to be ready for demand response energy management

New California energy code requires building systems to be ready for demand response energy management

Title 24 requires thermostats, HVAC systems, networked lighting controllers, and building automation systems to be ready for two-way communication


April 10, 2014

Starting in June, California’s latest version of its Title 24 building code kicks in, requiring several systems come with demand response capability. Every new or retrofit thermostat, HVAC system, networked lighting controller, and building automation system in the state will have to be ready for two-way, automated utility-to-customer energy management. Non-residential building lighting systems will be required to have daylight-matching adjustment, dimming and demand response capabilities.

These devices and systems will be required to be “capable of receiving and automatically responding to at least one standards-based messaging protocol” to receive signals from utilities. There are a few standards that meet the requirement— OpenADR, SEP 2.0, and HomePlug.

OpenADR was developed by the California Energy Commission and Berkeley Labs. It offers tools to allow buildings and utilities to communicate about energy availability, price, and how buildings can execute and confirm actions to reduce power use.

These standards were enacted after the California Energy Commission identified flaws in the state’s approach to demand response in a 2013 report, including a failure to reach modest goals set in 2007 to reduce peak demand by 5%. The solution may come from a market-based program to encourage users to reduce demand during peak energy use periods. The new demand-response standards pave the way for this option.

(http://www.greentechmedia.com/articles/read/californias-title-24-a-grid-smart-thermostat-in-every-building)

Related Stories

Codes and Standards | Jan 11, 2021

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.

Codes and Standards | Jan 8, 2021

Court ruling gives UpCodes upper hand in fight over building codes database

Battle over IP property claims by ICC and other codes bodies continues.

Codes and Standards | Jan 8, 2021

Houston creates tax incentives for green stormwater elements

Businesses that install green roofs, rain gardens, permeable pavement, and rainwater harvesting are eligible.

Codes and Standards | Jan 7, 2021

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

May limit the number of firms that could compete for contracts.

Codes and Standards | Jan 7, 2021

Workers on some of Virginia’s major construction projects sue subcontractors for wage theft

Projects include new General Assembly Building, outpatient facility at Virginia Commonwealth University.

Codes and Standards | Jan 5, 2021

EPA finalizes first major update to Lead and Copper rule

Will accelerate pace of lead service line replacement.

Codes and Standards | Jan 5, 2021

Flood risk for affordable housing expected to triple by 2050

Some communities will have 90% of their affordable housing at risk.

Codes and Standards | Jan 4, 2021

Ranks of remote workers expected to double in five years

Nearly 23% of employees will work from outside of offices.

Codes and Standards | Dec 28, 2020

CSI and ASTM standards can now be connected through a central location

CROSSWALK web service accesses standards specific to projects from feasibility to turnover.

Codes and Standards | Dec 28, 2020

Dept. of Energy offers Better Buildings Field Validation Results Hub

One-stop-shop for information associated with technology validations in buildings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021