flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New California energy code requires building systems to be ready for demand response energy management

New California energy code requires building systems to be ready for demand response energy management

Title 24 requires thermostats, HVAC systems, networked lighting controllers, and building automation systems to be ready for two-way communication


April 10, 2014

Starting in June, California’s latest version of its Title 24 building code kicks in, requiring several systems come with demand response capability. Every new or retrofit thermostat, HVAC system, networked lighting controller, and building automation system in the state will have to be ready for two-way, automated utility-to-customer energy management. Non-residential building lighting systems will be required to have daylight-matching adjustment, dimming and demand response capabilities.

These devices and systems will be required to be “capable of receiving and automatically responding to at least one standards-based messaging protocol” to receive signals from utilities. There are a few standards that meet the requirement— OpenADR, SEP 2.0, and HomePlug.

OpenADR was developed by the California Energy Commission and Berkeley Labs. It offers tools to allow buildings and utilities to communicate about energy availability, price, and how buildings can execute and confirm actions to reduce power use.

These standards were enacted after the California Energy Commission identified flaws in the state’s approach to demand response in a 2013 report, including a failure to reach modest goals set in 2007 to reduce peak demand by 5%. The solution may come from a market-based program to encourage users to reduce demand during peak energy use periods. The new demand-response standards pave the way for this option.

(http://www.greentechmedia.com/articles/read/californias-title-24-a-grid-smart-thermostat-in-every-building)

Related Stories

Codes and Standards | Feb 10, 2021

More than two-thirds of construction companies say COVID-19 has not impacted their ESOP

Half of survey respondents say 2020 project profitability decreased due to pandemic.

Codes and Standards | Feb 9, 2021

New Jersey approves new electric vehicle-ready home requirement

Homebuyers must be given option for charging station on new construction.

Codes and Standards | Feb 9, 2021

New California law removes barriers to residential development

Measure removes restrictions for ADUs in urban areas and master planned communities.

Codes and Standards | Feb 8, 2021

Alliance yields more accurate data for rating and certifying systems of construction materials

Crosswalk API offers trusted format to specify and procure healthier products.

Codes and Standards | Feb 4, 2021

2021 IBC requires automatic doors for entrances to public buildings

One door must be either a full power-operated door or a low-energy power-operated door.

Codes and Standards | Feb 3, 2021

Two new International Code Council online code tools released

Offer detailed information about global building code usage and U.S. adoptions.

Codes and Standards | Feb 2, 2021

Biden tells OSHA to bolster COVID-19 safety rules

Order could lead to a national playbook for fighting COVID-19 on jobsites.

Codes and Standards | Feb 1, 2021

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.

Codes and Standards | Jan 28, 2021

Natl. Fire Protection Assn. releases new energy storage system fact sheet

Comes as Biden Administration prepares ambitious clean energy agenda.

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021