flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard offers test method to determine heat gain of office equipment

Office Buildings

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.


By Peter Fabris, Contributing Editor | May 18, 2015
New ASHRAE standard offers test method to determine heat gain of office equipment

A new standard from ASHRAE allows a test method for determining heat gains from office equipment. Image: Pixabay/PublicDomainPictures

ASHRAE has released a new standard that provides a test method to determine the heat gain generated by office equipment.

The growing use of plug loads coupled with insufficient data on how much energy they generate present a challenge to engineers in determining how to best cool a building.

ASHRAE/ANSI Standard 203-2014, Method of Test for Determining Heat Gain of Office Equipment Used in Buildings, prescribes methods of test to determine the range and average operating heat gains of electrical equipment for use in cooling load calculations.

The standard applies to plug-load type electrical equipment. Plug loads (computers, monitors, printers, projectors, etc.) use between 20% to 50% of a building’s energy.

Increased use of computers and advances in building techniques and building envelopes have made heat gain from electrical equipment a larger factor in engineering cooling systems.

“Most plug loads operate at a fraction of their nameplate electrical load, so, as a result, produce significantly less heat load than engineers may use in their cooling load calculations based on those nameplate values,” according to an ASHRAE statement. “This can result in over-sizing of air-conditioning equipment, resulting in extra initial cost for that equipment as well as higher operating cost.”

Related Stories

Codes and Standards | Dec 4, 2020

OSHA cites more than 200 employers for COVID-19 violations

Agency releases guidance on lessons learned from pandemic inspections.

Codes and Standards | Dec 1, 2020

Pandemic spurs nearly 16 million people to move from major cities

Most of the movement seems permanent.  

Codes and Standards | Nov 30, 2020

USGBC ready to catalyze LEED Positive future

New programs, updates will spur shift to regenerative strategies.  

Codes and Standards | Nov 30, 2020

Finalized 2021 Energy Code leaves out future-proofing provision

Appeals process nixed requirement for residential electrification readiness.

Codes and Standards | Nov 23, 2020

GBCI turns over GRESB ownership to global investment firm

Organization assesses sustainability performance of real estate and infrastructure portfolios and assets.

Codes and Standards | Nov 23, 2020

New industrywide clay brick EPD launched

Contributes toward LEED v.4.0 and v.4.1 materials and resources requirements.

Codes and Standards | Nov 18, 2020

Commissioning study finds median energy savings of 3% to 16%

Berkeley Lab examines results of commissioning across building types.

Codes and Standards | Nov 17, 2020

Midtown Manhattan’s empty offices could be converted to affordable housing

Advocates envision idle offices re-zoned to alleviate housing crisis.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021