flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard offers test method to determine heat gain of office equipment

Office Buildings

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.


By Peter Fabris, Contributing Editor | May 18, 2015
New ASHRAE standard offers test method to determine heat gain of office equipment

A new standard from ASHRAE allows a test method for determining heat gains from office equipment. Image: Pixabay/PublicDomainPictures

ASHRAE has released a new standard that provides a test method to determine the heat gain generated by office equipment.

The growing use of plug loads coupled with insufficient data on how much energy they generate present a challenge to engineers in determining how to best cool a building.

ASHRAE/ANSI Standard 203-2014, Method of Test for Determining Heat Gain of Office Equipment Used in Buildings, prescribes methods of test to determine the range and average operating heat gains of electrical equipment for use in cooling load calculations.

The standard applies to plug-load type electrical equipment. Plug loads (computers, monitors, printers, projectors, etc.) use between 20% to 50% of a building’s energy.

Increased use of computers and advances in building techniques and building envelopes have made heat gain from electrical equipment a larger factor in engineering cooling systems.

“Most plug loads operate at a fraction of their nameplate electrical load, so, as a result, produce significantly less heat load than engineers may use in their cooling load calculations based on those nameplate values,” according to an ASHRAE statement. “This can result in over-sizing of air-conditioning equipment, resulting in extra initial cost for that equipment as well as higher operating cost.”

Related Stories

Codes and Standards | Feb 10, 2021

More than two-thirds of construction companies say COVID-19 has not impacted their ESOP

Half of survey respondents say 2020 project profitability decreased due to pandemic.

Codes and Standards | Feb 9, 2021

New Jersey approves new electric vehicle-ready home requirement

Homebuyers must be given option for charging station on new construction.

Codes and Standards | Feb 9, 2021

New California law removes barriers to residential development

Measure removes restrictions for ADUs in urban areas and master planned communities.

Codes and Standards | Feb 8, 2021

Alliance yields more accurate data for rating and certifying systems of construction materials

Crosswalk API offers trusted format to specify and procure healthier products.

Codes and Standards | Feb 4, 2021

2021 IBC requires automatic doors for entrances to public buildings

One door must be either a full power-operated door or a low-energy power-operated door.

Codes and Standards | Feb 3, 2021

Two new International Code Council online code tools released

Offer detailed information about global building code usage and U.S. adoptions.

Codes and Standards | Feb 2, 2021

Biden tells OSHA to bolster COVID-19 safety rules

Order could lead to a national playbook for fighting COVID-19 on jobsites.

Codes and Standards | Feb 1, 2021

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.

Codes and Standards | Jan 28, 2021

Natl. Fire Protection Assn. releases new energy storage system fact sheet

Comes as Biden Administration prepares ambitious clean energy agenda.

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021