flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nebraska’s Midland University receives a new ‘kitchen table’ courtesy KWK Architects

University Buildings

Nebraska’s Midland University receives a new ‘kitchen table’ courtesy KWK Architects

The new gathering space is completed and ready for students returning for fall semester.


By David Malone, Associate Editor | August 27, 2018
Eikmeier Commons at Midland University

Courtesy Midland University

The new Eikmeier Commons, the final stage of Midland University’s $1.5 million Olson Student Center dining hall, has been described by donors as a “kitchen table” for the Nebraska campus. The Eikmeier Commons makes use of the Olson Student Center’s under-utilized 4,700-sf lower level.

The KWK Architects-designed space added 75 built-in seats surrounding solid surface countertops to support the Warrior Grille and provides soft-seating for flexibility and group gathering.The space also includes dimmable LED fixtures, 22 television monitors, a game area, and a performance stage featuring a stone surround fireplace. Two new conference rooms and an ADA-compliant restroom are also included.

 

See Also: Academic honors: The importance of residence halls

 

The goal of the new space was to create somewhere for Midland students to gather and connect while not in the classroom or participating in any extracurricular activities. In addition to KWK Architects, the project also included Fremont Electric (electrical contractor) and All Systems Inc. (mechanical contractor).

Related Stories

Sports and Recreational Facilities | Nov 27, 2017

The University of Memphis unveils the new home of the men’s basketball program

The Laurie-Walton Family Basketball Center will provide a strong commitment to donor and VIP cultivation.

Adaptive Reuse | Nov 10, 2017

Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center

Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.

University Buildings | Nov 6, 2017

A reconstructed building sets the standard for future rehabs at Cornell

Early AE collaboration played a major role in moving this project forward efficiently. 

University Buildings | Oct 13, 2017

The University of Oklahoma receives its first residential colleges

The residential communities were designed by KWK Architects and combine living and learning amenities.

University Buildings | Oct 12, 2017

USC to debut new bioscience center next month

The building is designed to maximize recruitment and interaction of scientists and researchers.

University Buildings | Oct 12, 2017

The Center for Wounded Veterans is a first for a university campus

The Chez Family Foundation Center for Wounded Veterans in Higher Education is the first building of its kind on a U.S. college campus.

University Buildings | Oct 10, 2017

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021