flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

University Buildings

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

Clark Nexsen designed the new building.


By David Malone, Associate Editor | May 22, 2018
Fitts-Woolard Hall exterior

Courtesy Clark Nexsen

NC State University has officially broken ground on Fitts-Woolard Hall, a new $150 million engineering building on Centennial Campus. The 250,000-sf facility was designed by Clark Nexsen and will feature a transparent design that puts “engineering on display.”

The building’s main entry is flanked by a structural testing lab, senior student project space, and a large scale driving simulator that are all visible on the exterior and interior of the building.

 

Fitts Woodlard HallCourtesy Clark Nexsen.

 

Collaboration and interaction will be supported throughout the four-story building in high degrees of transparency. Stairs at the end of the building will act as connecting threads between floors and reveal the building’s structural and mechanical systems as an additional instructional tool. An outdoor terrace, interspersed seating, and an open, collaborative space on the second floor known as “the hearth” will promote socialization and interaction between students.

 

See Also: South Dakota State University to receive new apartment and townhouse neighborhood

 

The third and fourth floors, which will be contained in a floating volume, will house faculty offices, graduate student space, and additional classrooms and research labs. Overall, Fitts-Woolard Hall will contain over 100 classrooms and laboratories and house the Department of Civil, Construction and Environmental Engineering and the Fitts Department of Industrial and System Engineering.

Skanska is the project’s general contractor.

 

Related Stories

| May 8, 2012

Morgan/Harbour completes three projects at Columbia Centre

Projects completed on behalf of property owner, White Oak Realty Partners, LLC, Pearlmark Realty Partners, LLC and Angelo Gordon & Co.

| May 7, 2012

2012 BUILDING TEAM AWARDS: TD Ameritrade Park

The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 2, 2012

Building Team completes two additions at UCLA

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.

| May 1, 2012

Construction is underway on MLK ambulatory care center in L.A.

Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.

| Apr 30, 2012

Virginia Commonwealth unveils design for Arts Institution

Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 17, 2012

Princeton Review releases “Guide to 322 Green Colleges”

The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their academic offerings, campus infrastructure, activities and career preparation.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021