flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

University Buildings

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

Clark Nexsen designed the new building.


By David Malone, Associate Editor | May 22, 2018
Fitts-Woolard Hall exterior

Courtesy Clark Nexsen

NC State University has officially broken ground on Fitts-Woolard Hall, a new $150 million engineering building on Centennial Campus. The 250,000-sf facility was designed by Clark Nexsen and will feature a transparent design that puts “engineering on display.”

The building’s main entry is flanked by a structural testing lab, senior student project space, and a large scale driving simulator that are all visible on the exterior and interior of the building.

 

Fitts Woodlard HallCourtesy Clark Nexsen.

 

Collaboration and interaction will be supported throughout the four-story building in high degrees of transparency. Stairs at the end of the building will act as connecting threads between floors and reveal the building’s structural and mechanical systems as an additional instructional tool. An outdoor terrace, interspersed seating, and an open, collaborative space on the second floor known as “the hearth” will promote socialization and interaction between students.

 

See Also: South Dakota State University to receive new apartment and townhouse neighborhood

 

The third and fourth floors, which will be contained in a floating volume, will house faculty offices, graduate student space, and additional classrooms and research labs. Overall, Fitts-Woolard Hall will contain over 100 classrooms and laboratories and house the Department of Civil, Construction and Environmental Engineering and the Fitts Department of Industrial and System Engineering.

Skanska is the project’s general contractor.

 

Related Stories

| May 1, 2014

First look: Cal State San Marcos's posh student union complex

The new 89,000-sf University Student Union at CSUSM features a massive, open-air amphitheater, student activity center with a game lounge, rooftop garden and patio, and ballroom space.

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Science, engineering find common ground on the Northeastern University campus [slideshow]

The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021