flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M+W Group acquires LifeTek Solutions in America

M+W Group acquires LifeTek Solutions in America

 

Acquisition intended to strengthen M+W's technological and process expertise in the Life Sciences industry.


By BD+C Staff | March 29, 2013

 

The global engineering and construction company M+W Group has announced 
that their operations in the Americas have acquired 100% ownership of LifeTek 
Solutions, Inc. With this acquisition, M+W Americas also obtains LifeTek’s 
25% share in the exclusive SmartFit Modular BioSuites and FillSuites.
 
LifeTek’s team of industry recognized experts specialize in developing technically 
driven projects in the pharmaceutical and biotechnology communities. Adept in the 
design of equipment and arrangements for these projects, the LifeTek team has the 
operating, maintenance, design, construction, and qualification background that 
founds a thorough understanding of how best to compose a manufacturing process 
and ensure their customers success. Their exclusive SmartFit modular BioSuites 
and FillSuites cut delivery time in half while providing proven field-tested 
performance. 
 
“Emerging technologies in the Life Science industries are transforming the way 
therapeutics are manufactured. The synergy between M+W Group and LifeTek will 
bring a world of innovative technology and expertise to our clients, assisting them to 
embrace new processes and streamline project delivery.” said Rick Whitney, 
President and CEO of M+W Americas.
 
“We are very excited about this acquisition.” commented George Wiker, Principal of 
LifeTek. “Together, M+W Group and LifeTek will provide customers with unmatched 
engineering depth in a single-firm solution from concept to start-up.”
 
 
About M+W Group (www.mwgroup.net): M+W Group is the leading global engineering, 
construction and project management company in the fields of Advanced Technology 
Facilities, Life Science & Chemicals, Energy & Environment Technologies and High-Tech 
Infrastructure. From concept development to turnkey services the company manages projects 
of all sizes ensuring rapid realization, high quality standards and cost-effective completion. 
With its competence to link process and automation technologies and complex facilities to 
integrated solutions M+W Group primarily focuses on leading companies in the fields of 
electronics, photovoltaics, life science, chemicals, energy, automotive, security and 
communication, as well as research institutes and universities. M+W Group is the holding 
company with headquarters in Stuttgart, Germany. In 2011 the company generated an order 
intake of $3.6 billion and revenues of $3.5 billion with more than 7,000 employees. In 2012 
M+W Group celebrated its 100th anniversary.
 
M+W Group is owned by the Austrian Stumpf Group that is globally successful in the areas of 
High-Tech Engineering, Smart & Renewable Energy, Real Estate and Technology 
Investments.
 
About LifeTek (www.lifetek.com): LifeTek is a design and consulting team who work to help 
BioPharm companies succeed in developing processes, build manufacturing capacity as well 
as establish & maintain compliance. LIFETEK focuses exclusively on pharmaceutical and 
biological projects with a strong understanding that the design of a pharmbio project begins 
with the process, whether it is a laboratory, pilot plant, or full scale manufacturing 
facility. LifeTek’s philosophy is to provide a unique solution to the needs of its client base by 
providing standard and validateable process designs and process systems to improve 
delivery, reduce cost and assure successful startup while minimizing risk.
About SmartFit Modular (www.smartFit.com): SmartFit Modular offers complete 
bioprocessing and aseptic filling suites which can be erected within an existing building, 
anywhere in the world. SmartFit suites can accommodate projects from development through 
market launch. The affordable solution can speed the rate of return on the investment.
 
Source: M+W Group

Related Stories

| Apr 30, 2014

Visiting Beijing's massive Chaoyang Park Plaza will be like 'moving through a urban forest'

Construction work has begun on the 120,000-sm mixed-use development, which was envisioned by MAD architects as a modern, urban forest.

| Apr 29, 2014

Best of Canada: 12 projects nab nation's top architectural prize [slideshow]

The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 28, 2014

Welcome to the Hive: OVA designs wild shipping container hotel for competition

Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

| Apr 24, 2014

Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum

LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.

| Apr 23, 2014

Ahead of the crowd: How architects can utilize crowdsourcing for project planning

Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 23, 2014

Experimental bot transfers CAD plans onto construction sites

The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021