flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Murchie Science Building Expansion completes at the University of Michigan-Flint

University Buildings

Murchie Science Building Expansion completes at the University of Michigan-Flint

HED designed the project.


By David Malone, Managing Editor | July 27, 2021
MSB interior exterior
MSB interior exterior

A new 61,000-sf, $29.5 million Murchie Science Building (MSB) addition has completed on the University of Michigan-Flint campus. The facility was designed to respond to the university’s dramatically growing STEM program and support the College of Innovation and Technology while also providing a new gateway building to the school’s entire student body.

The MSB is organized to support immersive learning on each of its four floors. Three programatic “bars” connect and run parallel to the existing linear structure supporting varied learning and collaborative experiences. A central interaction and collaborative bar brings together the two flanking bars of experiential learning and accessible faculty. At the highly visible east gateway end of the addition each bar cantilevers out over the landscape to different degrees with the central bar increasing in height. An all glass lobby floats below the cantilevered architecture to provide a highly visible point of arrival.

 

MSB cantilevers

 

The facility also includes:

— two-story high collaborative spaces visible on all floors at the west end of the addition that promote vertical connectivity and visibility before floors

— classroom and lab spaces organized in a contiguous bar that provide flexibility for future room configuration and alternate pedagogies

— a main ground floor interior circulation system that integrates an existing east-west campus pathway that will increase exposure and promote STEM programs to students passing through the building

— a system of protected pathways, locking doors, and the strategic use of opaque solid walls that provide a secure-in-place strategy for all occupants of the building.

The layered cantilevered forms of the addition integrate with and advance the existing linear architecture to create an integrated gateway that is highly visible point of entry and arrival into the university.

 

MSB exterior

 

MSB lab space

 

MSB interior space

 

MSB interior/exterior lab

Related Stories

University Buildings | Aug 6, 2021

Is air quality the next hot campus amenity?

New research shows that students want to be back on campus, but they—and their parents—are asking more of higher ed institutions.

Architects | Aug 5, 2021

Lord Aeck Sargent's post-Katerra future, with LAS President Joe Greco

After three years under the ownership of Katerra, which closed its North American operations last May, the architecture firm Lord Aeck Sargent is re-establishing itself as an independent company, with an eye toward strengthening its eight practices and regional presence in the U.S.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

University Buildings | Jul 14, 2021

New 678-bed student housing development breaks ground near the University of South Carolina

CRG has partnered with Landmark Properties on the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021