flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mortenson Construction incorporates 100-year-old barn into new Portland office space

Reconstruction & Renovation

Mortenson Construction incorporates 100-year-old barn into new Portland office space

Mortenson deconstructed the barn and repurposed it for the new space.


By David Malone, Associate Editor | July 18, 2017
The kitchenette at Mortenson Construction's new Portland office

Photo courtesy Mortenson Construction

Before Mortenson Construction moved into its new Portland office in the Crane Building at 710 Northwest 14th Avenue, the space was renovated with elements of a 100-year-old barn as the focal point.

Mortenson found the barn in Colton, Ore., purchased it, and began the deconstruction and repurposing process. The Douglas fir barn was used for the 9,000-sf office’s workspaces and trim.

 

Wood trim from the repurposed barn in a Mortenson Construction workspacePhoto courtesy Mortenson Construction.

 

Reclaimed wood from the barn was incorporated into cabinetry, workstations, the welcome desk, a bike rack, an art timeline wall, and focal piece wood walls in conference rooms. Additionally, Douglas fir barn rafters were repurposed as baseboards.

Continuing the retro look throughout the space an antique crosscut saw found in the barn is displayed in the conference room, an antique refrigerator from the mid-1920s is being used as a decorative piece on a stair cap, and a conference room table has been fashioned out of an 1890s-era door from an estate on Portland’s east side.

 

Bike rack made from repurposed wood at Mortenson Construction's new officePhoto courtesy Mortenson Construction.

 

Other touches include a mural painted by local artist April Mehls, exposed brick and large industrial windows, and a brick painting in the kitchenette that pays homage to the signage in the first Mortenson office.

 

Close-up of repurposed wood cabinet at Mortenson Construction officePhoto courtesy Mortenson Construction.

 

Mortenson Construction's office mural painted by April MehlsPhoto courtesy Mortenson Construction.

 

Window made from reclaimed barn wood in the Mortenson Construction OfficePhoto courtesy Mortenson Construction.

Related Stories

Energy Efficiency | Jun 13, 2016

The nation’s largest net zero-plus commercial building retrofit opens in L.A.

The goal of the Net Zero Plus Electrical Training Institute is for this structure to become a model for emergency operations centers for communities. 

Sustainability | Jun 8, 2016

New program certifies the performance of existing buildings in the U.S.

BREEAM USA, an offshoot of a program already in place in Europe, aims to ease the point of entry.  

Drones | Apr 25, 2016

The Tremco SkyBEAM UAV is the first to be approved by the FAA for nighttime commercial operation

The SkyBEAM UAV is used for identifying energy leaks, rooftop damage, deteriorating façades, and safety issues without requiring scaffolding or cranes.

Adaptive Reuse | Apr 7, 2016

Redevelopment plan announced for Chicago’s historic Cook County Hospital

The century-old, Beaux Arts architecture-inspired hospital will transform into a mixed-use development. 

High-rise Construction | Mar 3, 2016

LA's U.S. Bank Tower to build exterior glass slide leading from 70th to 69th floors

The glass slide, part of a $50 million renovation project, will stretch 45 feet along the exterior of the building.

Sponsored | Reconstruction & Renovation | Feb 16, 2016

Historic Building Gets New Life on Campus

The renovation of the historic Tobey Building provided one of the most state-of-the-art HVAC systems in the U.S.

Reconstruction & Renovation | Jan 29, 2016

Understanding the value of physical due diligence

Physical inspections can range widely by discipline, level of detail, and the resulting deliverable, leaving even seasoned industry veterans unsure of when assessments make sense. Wiss, Janney, Elstner’s Ross Smith sheds light on building condition assessments.

Mixed-Use | Jan 25, 2016

SOM unveils renderings of dual-tower Manhattan West development

The five million-sf project includes two office towers, a residential tower, retail space, and a new public square.

Reconstruction & Renovation | Sep 29, 2015

What went wrong? Diagnosing building envelope distress [AIA course]

With so many diverse components contributing to building envelope assemblies, it can be challenging to determine which of these myriad elements was the likely cause of a failure.

Reconstruction & Renovation | Aug 12, 2015

Frank Gehry is working on master plan for the L.A. River

The architect is stressing water reclamation and greater public access

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021