flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development includes University of California-San Diego campus extension

Mixed-Use

Mixed-use development includes University of California-San Diego campus extension

The 562,000-sf development was designed by Carrier Johnson + CULTURE and is located five blocks from the San Diego Padres’ Petco Park.


By David Malone, Associate Editor | August 10, 2017
A rendering of the retail and restaurant space at Parks & Market

Rendering courtesy of Carrier Johnson + CULTURE

At a cost of $275 million, a new mixed-use project in San Diego will combine residential space, office space, and retail space with a University of California-San Diego campus extension. The project, designed by Carrier Johnson + CULTURE and dubbed Parks & Market, recently broke ground at its location five blocks away from the San Diego Padres’ Petco Park.

A 34-story residential tower will be the tallest component of the development. It will comprise 426 residential units, 85 of which will be set aside for affordable housing. Retail and restaurant space will be located at street level. There will be below-grade parking for up to 560 cars

 

An exterior rendering of Parks & MarketCourtesy of Carrier Johnson + CULTURE.

 

Parks & Market’s most unique aspect is the 66,000 sf of space designated for use by UC-San Diego. The Innovative Cultural and Education Hub will be the satellite campus for the university and will bring one of the area’s largest learning institutions to San Diego’s downtown.

The historic Remmen Building, which is located on site, will be preserved as part of the project and a themed public plaza will celebrate the neighborhood and its history.

Related Stories

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Mixed-Use | Apr 25, 2017

Dutch building incorporates 22 emojis into its façade

The emoji building is part of a larger mixed-use development built around a 150-year-old oak tree.

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

Mixed-Use | Mar 27, 2017

The Plant brings terrace-to-table living to Toronto

Curated Properties and Windmill Developments have teamed up to create a mixed-use building with food as the crux of the project.

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021