flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami to get its first supertall building

Building Team

Miami to get its first supertall building

At 100 stories and 1,049 feet high, Waldorf Astoria Miami will include 360 private residences, in addition to the five-star hotel.


By Novid Parsi, Contributing Editor | May 11, 2022
Miami Supertall lead
Courtesy Waldorf Astoria.

After completing its first supertall building, 111 W 57th Street in New York, developer PMG is now preparing for the groundbreaking of the first supertall in Miami: Waldorf Astoria Miami. Recently, several other supertalls have been proposed for the city, such as Major and One Brickell City Centre.

On Biscayne Boulevard, Waldorf Astoria Miami will stand 100 stories and 1,049 feet high, surpassing the supertall minimum of 984 feet (300 meters). The tower’s concept design—which will feature nine spiraling, offset glass cubes—is led by Sieger Suarez Architects, in collaboration with architect Carlos Ott. The developers also partnered with interior design firm BAMO

The property will comprise 360 private residences with a starting list price of $1 million, in addition to guestrooms and suites within the five-star hotel. Residential amenities will include an owners-only lobby and lounge, hospitality suite for chef’s tastings and private gatherings, billiard room, kids’ club, and private pool deck. The residences will offer smart-home technology with custom mobile app access to concierge service. The app will connect to dining reservations, 24/7 room service, spa and fitness treatments, house car reservations, valet service, package delivery service, and dog walking services.

PMG joins development partners Greybrook Realty Partners, Mohari Hospitality, S2 Development, and Hilton to build the first supertall tower in Florida and the tallest residential building south of New York. Waldorf Astoria Hotel & Residences Miami is expected to break ground in summer 2022, with completion slated for 2026.

Building Team:

Developer: PMG

Development partners: Greybrook Realty Partners, Mohari Hospitality, S2 Development, and Hilton

Conceptual artist: Carlos Ott

Architectural partnership: Sieger Suarez Architects

MEP engineer: MG Engineering

Structural engineer: CHM Structural Engineers

Engineer: GRAEF

General contractor: John Moriarty and Associates

Supertall Miami Building Sunset
Courtesy Waldorf Astoria.
Supertall Miami Night Ext
Courtesy Waldorf Astoria Miami.

 

Related Stories

| Aug 11, 2010

Sika Sarnafil announces 2009 Project of the Year winners

Sika Sarnafil announced winners of the second annual Sika Sarnafil Roof Consultant Project of the Year competition today. First place was awarded to SRI Consultants, Inc., of Middleton, WI; second place to INSPEC, Inc., of Minneapolis, MN; and Simpson, Gumpertz & Heger of Los Angeles, California, won the third place honor. The competition recognizes and celebrates excellence in roofing design.

| Aug 11, 2010

Kingspan insulated panels showcase net-zero energy modeling

Kingspan Insulated Panels, Inc. is demonstrating energy modeling programs to illustrate how far Envelope First Strategies could advance beyond Leadership in Energy and Environmental Design (LEED), Energy Code and the Department of Energy (DOE) Net-Zero Energy goal of 2025. Kingspan will showcase the models in their exhibit (#954) during the Greenbuild 2009 International Conference and Expo, November 11-13 in Phoenix.

| Aug 11, 2010

Green Guide for Health Care launches pilot program, looks for participants

In first quarter 2010, the Green Guide for Health Care, in collaboration with Practice Greenhealth, is launching a one-year Green Guide for Health Care Operations Pilot Program for healthcare organizations engaged in any or all aspects of green operations initiatives, based on Green Guide v2.2 Operations section.

| Aug 11, 2010

Sustainable Buildings as Teaching Tools: 4 Strategies for Integrating Buildings into Experiential Learning

4 Strategies for Integrating Buildings into Experiential Learning

| Aug 11, 2010

Report: Most data centers are too cold

A recent study (PDF) by server and computing giants shows that data centers are wasting energy-and money-by over-cooling their servers, according to a story in The Register.

| Aug 11, 2010

New landscape rating system launches, completes green building puzzle

On November 5, 2009, the Sustainable Sites Initiative released the nation's first rating system for the design, construction and maintenance of sustainable landscapes, with or without buildings.

| Aug 11, 2010

Las Vegas announces Green Building Rebate Program

The city of Las Vegas announced it will begin a Green Building Rebate Program to stimulate new green building construction and provide energy efficiency retrofits to existing buildings. The green building program provides rebates for new construction and existing commercial and residential retrofits for buildings who construct buildings or projects to green building program standards.

| Aug 11, 2010

Morphosis builds 'floating' house for Brad Pitt's Make It Right New Orleans foundation

Morphosis Architects, under the direction of renowned architect and UCLA professor Thom Mayne, has completed the first floating house permitted in the U.S. for Brad Pitt’s Make It Right Foundation in New Orleans.The FLOAT House is a new model for flood-safe, affordable, and sustainable housing that is designed to float securely with rising water levels.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021