flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

The aquarium is planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium.


By BD+C Staff | July 23, 2014

If you thought it would have never been possible for a multimillion-dollar project in Brazil to help create hundreds of jobs for Americans, think again, because it’s happening now.

The Acquario Ceará is a Brazilian public aquarium designed, engineered, financed, and currently under construction by multiple U.S. firms. The crustacean-shaped structure of steel and glass will stand along the Atlantic coast of the northeastern Brazilian city Fortaleza, designed with the hopes of being a new icon for South America.

The aquarium's intricate, exoskeleton-esque metalwork facade, designed by Imagic Brasil, the Latin American division of Cincinnati-based architect Jack Rouse Associates, will be fabricated by Kansas City, Mo.-based Zahner, whose portfolio includes two Gehry structures: the Pritzker Pavilion in Chicago and the Guggenheim Canopy in New York City.

According to The Atlantic’s CityLab, International Concept Management (ICM), a small business and custom aquarium maker in Grand Junction, Colorado, is overseeing construction of the project.

The aquarium, planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium, is set to open in 2015. According to the Kansas City Star, the aluminum support frame and aluminum skin plates that will cover it are currently being made in Zahner’s Midwestern fabrication shops, while the state of Ceará's governmental website indicates tubes and pipes are being made in Houston under ICM's supervision. Components will be shipped south to come together for the project.

But like many projects of its scale, the aquarium is not free of controversy. Brazilian critics say the aquarium is being built without transparency, CityLab reports. Moreover, the fact that such an expensive recreational facility is being built in one of Brazil’s poorest state’s is deemed as distasteful by some. 

In the U.S., critics are aimed at the project’s financial backing, which includes a $105 million direct loan from the taxpayer-funded federal export credit agency Export-Import Bank of the United States.

More on the project at CityLab.

Related Stories

| Nov 25, 2013

Electronic plan review: Coming soon to a city near you?

With all the effort AEC professionals put into leveraging technology to communicate digitally on projects, it is a shame that there is often one major road block that becomes the paper in their otherwise “paperless” project: the local city planning and permitting department. 

| Nov 22, 2013

Kieran Timberlake, PE International develop BIM tool for green building life cycle assessment

Kieran Timberlake and PE International have developed Tally, an analysis tool to help BIM users keep better score of their projects’ complete environmental footprints.

| Nov 20, 2013

Architecture Billings Index slows in October; project inquiries stay strong

Following three months of accelerating demand for design services, the Architecture Billings Index reflected a somewhat slower pace of growth in October. The October ABI score was 51.6, down from a mark of 54.3 in September.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

| Nov 18, 2013

Lord Aeck Sargent opens metro D.C. office, updates brand

Architecture, design, and planning firm unveils its sixth office, plus a new visual identity system and website

| Nov 18, 2013

How do construction professionals use social media?

LinkedIn is the social network used by most construction professionals, according to the results of a newly released national survey conducted by the Construction Marketing Association. 

| Nov 17, 2013

How to spend your first 15 minutes with a prospect

Every business development person has been there. You’ve finally earned a few minutes to impress a prospect that you’ve been pursuing. This is your opportunity to shine. What do you say?

| Nov 17, 2013

Meet up with the BD+C team at Greenbuild. Drinks are on us!

To all our friends in the AEC industry, you are cordially invited to join the BD+C team at several fun events during the Greenbuild show this week. No RSVP required. Just show up and enjoy. 

| Nov 15, 2013

Halls of ivy keep getting greener and greener

Academic institutions have been testing the limits of energy-conserving technologies, devising new ways to pay for sustainability extras, and extending sustainability to the whole campus.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021