Carrying the brand of Marriott International, a new 26-story, 360-foot-tall tower will become the largest modular hotel in the world upon completion.
The hotel, designed by Danny Forster & Architecture, will be built over a 90-day period and topped with a modular roof and modular rooftop bar. All 168 guest rooms will be prefabricated and pre-furnished. The rooms will arrive at the site, 842 Sixth Avenue, fully constructed with finished painted walls, beds, sheets, pillows, flooring, and toiletries. The building’s public areas, such as the restaurant and lobby, will be built using traditional methods.
See Also: Amazon invests in a prefab module supplier
“This hotel takes every advantage of off-site manufacturing, as you might expect. But it does so in a way that defies expectation,” says Danny Forster, Principal, Danny Forster & Architecture, in a release. “We wanted to demonstrate that modular building can do more than just harness the efficiencies of the factory. It can produce a graceful and iconic tower. And yes, it can do so at the rate of an entire floor a day.”
The $65 million hotel is slated to open in late 2020 as the AC Hotel New York NoMad.
Related Stories
Giants 400 | Dec 16, 2020
Download a PDF of all 2020 Giants 400 Rankings
This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.
Giants 400 | Dec 3, 2020
2020 Hotel Sector Giants: Top architecture, engineering, and construction firms in the U.S. hospitality sector
Gensler, Jacobs, and Suffolk Construction top BD+C's rankings of the nation's largest hotel sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
Hotel Facilities | Nov 3, 2020
Hotel made from CLT opens at Fort Jackson, S.C.
This project used over 4,100 pieces of cross-laminated timber. It's the fourth CLT hotel in the Army's housing portfolio.
Hotel Facilities | Oct 27, 2020
Hotel construction pipeline dips 7% in Q3 2020
Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.
Hotel Facilities | Sep 22, 2020
‘Lifestyle’ is adding new color to the select-service hotel sector
A new WATG Strategy white paper examines the design characteristics of the blending.
Giants 400 | Aug 28, 2020
2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms
The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.
Coronavirus | Aug 25, 2020
Video: 5 building sectors to watch amid COVID-19
RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.
Hotel Facilities | Aug 14, 2020
5 strategies for creating safer, healthier hotel experiences
As hotels begin to reopen, the focus on health and safety takes priority while working to preserve the guest experience.
Hotel Facilities | Jul 30, 2020
Las Vegas’s Circa Resort & Casino will feature contactless technology throughout
The resort is slated to open in late 2020.
Hotel Facilities | Jun 25, 2020
Restoration of 1930s El Paso hotel completes
The project represented a cross-collaboration of Cooper Carry’s Hospitality studio and The Johnson Studio at Cooper Carry.