flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This Marriott is poised to take over the title as the world’s tallest modular hotel

Modular Building

This Marriott is poised to take over the title as the world’s tallest modular hotel

Danny Forster & Architecture designed the building.


By David Malone, Associate Editor | May 13, 2019
Rendering of completed hotel

All images courtesy Danny Forster & Architecture.

Carrying the brand of Marriott International, a new 26-story, 360-foot-tall tower will become the largest modular hotel in the world upon completion.

The hotel, designed by Danny Forster & Architecture, will be built over a 90-day period and topped with a modular roof and modular rooftop bar. All 168 guest rooms will be prefabricated and pre-furnished. The rooms will arrive at the site, 842 Sixth Avenue, fully constructed with finished painted walls, beds, sheets, pillows, flooring, and toiletries. The building’s public areas, such as the restaurant and lobby, will be built using traditional methods.

 

AN example of one of the modular guest rooms

See Also: Amazon invests in a prefab module supplier

 

This hotel takes every advantage of off-site manufacturing, as you might expect. But it does so in a way that defies expectation,” says Danny Forster, Principal, Danny Forster & Architecture, in a release. “We wanted to demonstrate that modular building can do more than just harness the efficiencies of the factory. It can produce a graceful and iconic tower. And yes, it can do so at the rate of an entire floor a day.”

The $65 million hotel is slated to open in late 2020 as the AC Hotel New York NoMad.

Related Stories

AEC Tech | Dec 8, 2020

COVID-19 affects the industry’s adoption of ConTech in different ways

A new JLL report assesses which tech options got a pandemic “boost.”

Modular Building | Dec 2, 2020

The hidden cost of modular construction

For a building to be truly sustainable, it must maintain the three corners of the triangle paradigm throughout the building’s lifecycle.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Building Team | Aug 21, 2020

A healthcare project in Wisconsin benefits from including MEP subs in early design discussions

Prefabrication played a major role in quickening construction.

University Buildings | Aug 2, 2020

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

Modular Building | May 22, 2020

‘Cargotecture’ is coming to North Carolina’s Research Triangle Park

Boxyard RTP, made from 38 shipping containers, will serve as a community gathering and social space.

Coronavirus | Apr 21, 2020

COVID-19 update: CallisonRTKL, Patriot, PODS, and USACE collaborate on repurposed containers for ACFs

CallisonRTKL and PODS collaborate on repurposed containers for ACFs

Modular Building | Mar 17, 2020

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.

Modular Building | Feb 16, 2020

On the West Coast, prefab gains ground for speedier construction

Gensler has been working with component supplier Clark Pacific on several projects.

Modular Building | Nov 18, 2019

A modular solution to help reduce homelessness

DOME is a Perkins and Will-designed prototype whose goal is to provide bridge housing to the unsheltered.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021