flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manhattan’s Meatpacking District has a new tallest tower

Office Buildings

Manhattan’s Meatpacking District has a new tallest tower

CetraRuddy designed the office building.


By David Malone, Associate Editor | September 19, 2018
412 W 15

Photo: David Sundberg

A new 270-foot-high office tower takes the title as the tallest building in Manhattan’s Meatpacking District. Offering 140,000 sf of new office space across 18 stories, 412 W 15 provides amenity and experience spaces more commonly found in multifamily buildings.

Among this lifestyle-oriented mix of spaces are a landscaped roof deck, tenant-specific outdoor spaces, and lounge amenities. In total, there are six terraces that provide 8,000 sf of outdoor space.

 

412 W 15Photo: David Sundberg.

 

The CetraRuddy-designed building’s facade combines dark metal with floor-to-ceiling windows. The tower also connects to an existing low-rise building on 14th street to form a through-block community of workspaces and ground-floor shops. The office layouts are open and flexible and almost completely column-free. Blackened stainless steel wall panels and terrazzo floors create a contemporary downtown vibe that is fitting for the Meatpacking District.

 

See Also: An elliptical office building goes with the flow in Boston

 

CetraRuddy Principal Eugene Flotteron, AIA, describes the tower as a “vertical campus that serves as a complete lifestyle workplace.”

Related Stories

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

| Oct 11, 2011

Onex completes investment in JELD-WEN

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021