flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manhattan’s Meatpacking District has a new tallest tower

Office Buildings

Manhattan’s Meatpacking District has a new tallest tower

CetraRuddy designed the office building.


By David Malone, Associate Editor | September 19, 2018
412 W 15

Photo: David Sundberg

A new 270-foot-high office tower takes the title as the tallest building in Manhattan’s Meatpacking District. Offering 140,000 sf of new office space across 18 stories, 412 W 15 provides amenity and experience spaces more commonly found in multifamily buildings.

Among this lifestyle-oriented mix of spaces are a landscaped roof deck, tenant-specific outdoor spaces, and lounge amenities. In total, there are six terraces that provide 8,000 sf of outdoor space.

 

412 W 15Photo: David Sundberg.

 

The CetraRuddy-designed building’s facade combines dark metal with floor-to-ceiling windows. The tower also connects to an existing low-rise building on 14th street to form a through-block community of workspaces and ground-floor shops. The office layouts are open and flexible and almost completely column-free. Blackened stainless steel wall panels and terrazzo floors create a contemporary downtown vibe that is fitting for the Meatpacking District.

 

See Also: An elliptical office building goes with the flow in Boston

 

CetraRuddy Principal Eugene Flotteron, AIA, describes the tower as a “vertical campus that serves as a complete lifestyle workplace.”

Related Stories

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021